Planning application

Land Surrounding Huyton Terrace Previously Baly Place Farm Bolton Road Adlington

Granted Chorley 21/00161/FULMAJ Major Full Planning

Works: Trees Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Section 73 application to vary condition no. 3 of planning permission ref: 15/00506/REMMAJ (which was a Reserved Matters Application for the erection of 158 dwellings) which required a footbridge link to be provided. The footbridge is not to be provided due to protected trees and levels. In addition, a 3m foot/cycle path through the site has been re-positioned to the south of plot 79 (42 Rossendale Drive) due to space restrictions in the previously approved position.

As published by the council, reference 21/00161/FULMAJ

Application record

Reference
21/00161/FULMAJ
Type
Major Full Planning
Status
Granted
Decision
Permit Full Planning Permission
Received
10 Feb 2021
Validated
10 Feb 2021
Decided
10 Sep 2021
Ward
Adlington And Anderton
Parish
Adlington
Decision by
Committee Decision

Timeline

Dates from the published record

  1. 10 Feb 2021

    Received by Chorley

  2. 10 Sep 2021

    Decision issued: Permit Full Planning Permission

  3. 15 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Stewart Milne Homes Agent, a developer registered in Aberdeen

Dissolved · incorporated 1978 · Aberdeen

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Chorley granted permission on 10 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 2 Hornby Close Adlington Chorley PR6 9FT

    21/00469/FULHH Submitted 15 Apr 2021 88m away

    Erection of single storey rear extension, creation of dropped kerb at front of property and new driveway/hardstanding

    Granted Householder Extension 12 docs
    Small domestic
  • Land Adjcent Rossendale Drive Adlington PR6 9AB

    26/00495/FUL Submitted 5 Jun 2026 118m away

    87% historically approved · decision due ~31 Jul

    Siting of temporary mobile sales unit, associated car parking and associated works (retrospective)

    Awaiting decision Full applications 29 docs
  • Land Adjcent Rossendale Drive Adlington PR6 9AB

    26/00496/ADV Submitted 5 Jun 2026 118m away

    Application for advertisement consent for the display of 5no. flag poles, 1no. V-stack sign, 1no. tall stack sign, 7no. low level non-illuminated signs and associated signage on mobile sales unit

    Granted Advertising 20 docs
  • Land Adjcent Rossendale Drive Adlington PR6 9AB

    26/00719/ADV Submitted 14 Aug 2026 118m away

    92% historically approved · decision due ~19 Oct

    Application for advertisement consent for the display of 1no. illuminated V stack sign, 9no. flag pole signs, 1no. illuminated stack sign, 5no. low level directional signs, 2no. small elevation mounted signs, "Sales Office" Elevation Sign and Site/Developer Name Illuminated elevation sign

    Awaiting decision Advertising 17 docs
  • Land Adjcent Rossendale Drive Adlington PR6 9AB

    26/00680/DIS Submitted 31 Jul 2026 118m away

    92% historically approved · decision due ~25 Sep

    Application to discharge conditions 23 (public open space), 29 (tresspass proof fence) and 35 (LEAP), attached to planning permission 22/00631/FULMAJ (Erection of 137no. dwellings, of which 30% will be affordable, together with associated roads, car parking and landscaping works)

    Awaiting decision 8 docs
    Major scheme
  • 40 Belmont Road Adlington Chorley PR6 9PU

    26/00115/FULHH Submitted 6 Feb 2026 120m away

    98% historically approved · decision due ~7 Apr

    Single storey rear extension.

    Awaiting decision Householder Extension 10 docs
    Small domestic

In Chorley

  • 26/00824/FUL Awaiting decision

    Plot 2 Old Withnell Stables Trigg Lane Heapey Chorley PR6 9BZ

    Application for technical details consent for the erection of 1no. self build dwelling pursuant to permission in principle 25/00224/PIP

    14 Sep 2026 Full applications
  • 26/00813/FUL Awaiting decision

    The Bungalow Ridley Lane Mawdesley Ormskirk L40 2RE

    Conversion of existing garage to create 1no. residential dwelling including roof alterations involving the raising of the ridge and eaves height to create a first floor, two storey side extension, new access, off road car parking, and associated landscape works

    10 Sep 2026 Full applications
  • 26/00809/FUL Awaiting decision

    Scrap Yard Town Lane Charnock Richard Chorley PR7 5HQ

    Installation of water tank (retrospective)

    9 Sep 2026 Full applications
  • 26/00798/FUL Awaiting decision

    Land Next To Rose Cottage Sandy Lane Mawdesley Chorley L40 2QB

    Creation of a wildlife pond

    8 Sep 2026 Full applications
  • 26/00792/FUL Awaiting decision

    Golden Acres Ltd Plocks Farm Liverpool Road Bretherton Leyland PR26 9AX

    Section 73 application to vary condition 4 (approved plans) attached to planning permission 20/00449/FULMAJ (Demolition of existing building and erection of new packing hall (with administration facilities) and new canopy over service yard) to reduce demolition with plant / infrastructure contained within the existing building.

    7 Sep 2026 Full applications