Planning application

Land To The West Side Of Blackburn Road Chorley

Granted Chorley 19/01113/OUTMAJ Outline Major Planning (with ES)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Outline application for the construction of up to 233 dwellings with all matters reserved, save for access (resubmission of approved application ref. 17/00714/OUTMAJ)

As published by the council, reference 19/01113/OUTMAJ

Application record

Reference
19/01113/OUTMAJ
Type
Outline Major Planning (with ES)
Status
Granted
Decision
Granted As published: Permit Outline Planning Permission
Received
25 Nov 2019
Validated
25 Nov 2019
Decided
13 Sep 2021
Ward
Chorley North And Astley
Parish
Chorley
Decision by
Committee Decision

Site history

Applications at this address on the Chorley register

This site has had 9 applications since 2019: 4 approved, 0 refused.

  • 26/00823/FULMAJ Awaiting decision

    Land To The West Side Of Blackburn Road Chorley

    Section 73 application to vary conditions 3 (approved plans) and 18 (landscape details) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works) to alter the appearance, scale and siting of block Q.

    Submitted 14 Sep 2026
  • 26/00565/FULMAJ Awaiting decision

    Land To The West Side Of Blackburn Road Chorley

    Section 73 application to remove conditions 29 (off-site highway mitigation scheme) and 31 (off-site highway mitigation phasing and delivery) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Submitted 27 Jun 2026
  • 26/00167/DIS Awaiting decision

    Land To The West Side Of Blackburn Road Chorley

    Application to discharge conditions 32 (Car Park Management Strategy) and 33 (Travel Plan) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Submitted 19 Feb 2026 Conditions
  • 25/01212/DIS Granted

    Land To The West Side Of Blackburn Road Chorley

    Application to discharge condition 14 (Levels - Phase 2b) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Decided 14 Apr 2026 Conditions
  • 25/00503/FULMAJ Granted

    Land To The West Side Of Blackburn Road Chorley

    Temporary use of land for storage of commercial vehicles / trucks / parts / plant and machinery (Use Class B8)

    Decided 11 Sep 2026
  • 25/00426/DIS Granted

    Land To The West Side Of Blackburn Road Chorley

    Application to discharge condition 22 (employment and skills plan) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Decided 7 Sep 2026
  • 25/00196/DIS Awaiting decision

    Land To The West Side Of Blackburn Road Chorley

    Application to discharge condition 17 (biodiversity net gain plan) parts a), b), and c) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Submitted 26 Feb 2025 Conditions
  • 24/00763/MNMA Decided

    Land To The West Side Of Blackburn Road Chorley

    Minor non material amendment to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works) involving changes to levels and development platforms.

    Decided 1 Oct 2024 Amendments

Timeline

Dates from the published record

  1. 25 Nov 2019

    Received by Chorley

  2. 13 Sep 2021

    Decision issued: Permit Outline Planning Permission

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Lichfields Agent, registered in Newbury

Active · incorporated 2006 · Newbury

1,983 applications on PlanIndex · across 164 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

187 documents on file for this application

  • DECISION - GRANT OUTLINE PP Decision · 13 Sep 2021
  • S106 AGREEMENT Planning File · 08 Sep 2021
  • REVISED FORMS - CERT. CHANGED Planning Application (inc initial correspondence) · 10 Sep 2020
  • COMMITTEE REPORT Committee Report · 06 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • CONTRIBUTOR INVITE TO COMMITTEE Correspondence · 05 Aug 2020
  • COMMITTEE NOTIFICATION TO AGENT / APPL Correspondence · 05 Aug 2020
  • LLFA RESPONSE Consultee Response · 30 Apr 2020
  • LCC HIGHWAYS Consultee Response · 14 Feb 2020
  • LCC HIGHWAYS Consultee Response · 14 Feb 2020
  • LCC HIGHWAYS Consultee Response · 14 Feb 2020
  • ECOLOGY UNIT Consultee Response · 21 Jan 2020
  • LCC HIGHWAYS Consultee Response · 20 Jan 2020
  • EA RESPONSE Consultee Comment · 10 Jan 2020
  • UNITED UTILITIES Consultee Response · 06 Jan 2020
  • NEIGHBOUR Neighbour Response · 24 Dec 2019
  • PUBLIC COMMENT Neighbour Response · 19 Dec 2019
  • CANAL & RIVER TRUST Consultee Response · 18 Dec 2019
  • WEST LANCS ACKNOWLEDGEMENT LETTER Consultee Response · 18 Dec 2019
  • NATURAL ENGLAND Consultee Response · 17 Dec 2019
  • SCHOOLS PLANNING TEAM Consultee Response · 16 Dec 2019
  • CLLR OBJECTIONS Consultee Comment · 12 Dec 2019
  • HISTORIC ENGLAND Consultee Response · 12 Dec 2019
  • ARCHAEOLOGY Consultee Response · 12 Dec 2019
  • CONSULTATION LETTER Correspondence · 11 Dec 2019
  • CONSULTATION LETTER Correspondence · 11 Dec 2019
  • PRESTON COUNCIL ACKNOWLEDGEMENT Consultee Response · 09 Dec 2019
  • CONSULTATION LETTER Correspondence · 06 Dec 2019
  • CONSULTATION LETTER Correspondence · 06 Dec 2019
  • APPENDIX 10.1 Report · 06 Dec 2019
  • APPENDIX 10.2 Report · 06 Dec 2019
  • APPENDIX 11.1 Report · 06 Dec 2019
  • PHASE 1 GEO-ENVIRONMENTAL INVESTIGATION Report · 06 Dec 2019
  • DAS Report · 06 Dec 2019
  • ES ADDENDUM LETTER Report · 06 Dec 2019
  • ES ADDENDUM Report · 06 Dec 2019
  • SCI Report · 06 Dec 2019
  • ACKNOWLEDGEMENT LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • CONSULTATION LETTER Correspondence · 03 Dec 2019
  • NEIGHBOUR LETTER - INITIAL CONSULTATION Correspondence · 03 Dec 2019
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 03 Dec 2019
  • COAL AUTHORITY Consultee Response · 03 Dec 2019
  • 61187_01 BOTANY BAY EIA COMPLIANCE STATEMENT Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 1 - INTRODUCTION Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 10- ARCHAEOLOGY AND HERITAGE Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 11 - GROUND CONDITIONS Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 15 - NOISE AND VIBRATION Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 13 - TRANSPORT AND ACCESS Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 12 - DRAINAGE AND FLOOD RISK Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 14 - AIR QUALITY AND DUST Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 2.2 - CBC ADDITIONAL SITE ACKNOWLEDGEMENT (MAY 2017) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 2.1 - CBC EIA SCOPING OPINION (MAY 2017) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 8.2 - LANDSCAPE ASSESSMENT TABLES Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 8.3 - VISUAL ASSESSMENT TABLES Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 8.1 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT METHODOLOGY Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 8.4 - STRATEGIC LANDSCAPE MASTERPLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.3 - BREEDING BIRD SURVEY Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.2 - PHASE 2 VEGETATION SURVEY Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.5 - OTTER AND WATER VOLE SURVEY Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.6 - REPTILE SURVEYS Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.4 - BAT SURVEY Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 11.3 - INTEGRA CONSULTING ENVIRONMENTAL (2017)_ LAND AT BOTANY BAY MINE Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 11.4 - INTEGRA CONSULTING ENVIRONMENTAL (2017) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 10.3 - LOCATIONS OF LISTED BUILDINGS WITHIN 1KM OF APPLICATION SITES Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 12.1 - BOTANY BAY FLOOD RISK ASSESSMENT Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.7 - TYLER GRANGE BOTANY BAY ECOLOGICAL SCOPING REPORT 2013 Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 9.1 - DESK STUDY AND EXTENDED PHASE I HABITAT SURVEY Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 12.2 - LAND AT GREAT KNOWLEY FLOOD RISK ASSESSMENT Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.1 -BOTANY BAY TA - APPENDIX D (RETAIL SITE) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.1 -BOTANY BAY TA - APPENDIX B (RETAIL SITE) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.1 - BOTANY BAY TA - APPENDIX A (RETAIL SITE) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.1 - BOTANY BAY TA - APPENDIX C PART 1 (RETAIL SITE) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.1 - BOTANY BAY TA - TEXT- PLANS (RETAIL SITE) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.2 - BOTANY BAY TA - APPENDIX D Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.2 - BOTANY BAY TA - APPENDIX C PART 1 Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.2 - BOTANY BAY TA - APPENDIX C PART 2 Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.1 -BOTANY BAY TA - APPENDIX C PART 2 (RETAIL SITE) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.2 -BOTANY BAY TA - APPENDIX B Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.2 - BOTANY BAY TA - TEXT- PLANS- DRAWINGS (APPENDIX A) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 13.3 - FRAMEWORK TRAVEL PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 14.1 - AIR QUALITY AND DUST - TECHNICAL APPENDICES Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 15.1 - GUIDANCE (RESI-RETAIL) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 15.3 - TRAFFIC NOISE DATA AND ASSESSMENT (RETAIL-RESI) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 15.4 - NOISE PROPAGATION MODELLING (RESI-RETAIL) Planning Application (inc initial correspondence) · 25 Nov 2019
  • APPENDIX 15.2 - NOISE SURVEY DATA (RESI-RETAIL) Planning Application (inc initial correspondence) · 25 Nov 2019
  • ABBREVIATIONS Planning Application (inc initial correspondence) · 25 Nov 2019
  • 61187 BOTANY BAY - PLANNING STATEMENT(1) Planning Application (inc initial correspondence) · 25 Nov 2019
  • (APPROVED) ACCESS_DRAWING_-_TPMA1498-100-658709 Site Elevations, Building Plans etc. · 25 Nov 2019
  • LAND AT GREAT KNOWLEY NORTH INDICATIVE SECTIONS 08.10.19 Site Elevations, Building Plans etc. · 25 Nov 2019
  • FI001 LAND AT GREAT KNOWLEY NORTH RESIDENTIAL MASTERPLAN Site Elevations, Building Plans etc. · 25 Nov 2019
  • FI001 LAND AT GREAT KNOWLEY CHORLEY - PARAMETERS PLAN Site Elevations, Building Plans etc. · 25 Nov 2019
  • FI001LP01 - LAND AT GREAT KNOWLEY NORTH - LOCATION PLAN 01-06-17 Site Location Plan · 25 Nov 2019
  • 74329 LAND AT GREAT KNOWLEY- TRANSPORT STATEMENT Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 17 - SUMMARY OF MITIGATION AND RESIDUAL EFFECTS Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 16 - CUMULATIVE IMPACTS Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 8 - LANDSCAPE AND VISUAL Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 9 - ECOLOGY AND NATURE CONSERVATION Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 7 - SOCIO-ECONOMICS Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 6 - PLANNING POLICY AND CONTEXT Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 2 - APPROACH Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 5 - THE PROPOSED DEVELOPMENT Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 3 - SITE DESCRIPTION Planning Application (inc initial correspondence) · 25 Nov 2019
  • CHAPTER 4 - ALTERNATIVES Planning Application (inc initial correspondence) · 25 Nov 2019
  • VOLUME 1 NON-TECHNICAL SUMMARY Planning Application (inc initial correspondence) · 25 Nov 2019
  • ES VOLUME 3 APPENDICES FRONT COVER AND CONTENTS Planning Application (inc initial correspondence) · 25 Nov 2019
  • ES VOLUME 2 FRONT COVER CONTENTS TABLES AND FIGURES Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 1.1 - OVERALL RED EDGE BOUNDARY PLAN(1) Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 1.2 - APPLICATION SITE 1 RED EDGE BOUNDARY Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 1.3 - APPLICATION SITE 2 RED EDGE BOUNDARY Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 1.4 - APPLICATION SITE 3 RED EDGE BOUNDARY Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.1 - APPLICATION SITE 1 LAND USE PARAMETERS PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.2 - APPLICATION SITE 1 BUILDING HEIGHT PARAMETER PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.3 - APPLICATION SITE 1 MEANS OF ACCESS Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.4 - APPLICATION SITE 1 DEMOLITION PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.5 - APPLICATION SITE 2 LAND USE AND BUILDING HEIGHTS PARAMETERS PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.6 - APPLICATION SITE 2 MEANS OF ACCESS Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.7 - APPLICATION SITE 3 LAND USE AND BUILDINGS HEIGHTS PARAMETERS PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.8 - APPLICATION SITE 1 ILLUSTRATIVE MASTERPLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.9 - APPLICATION SITE 2 ILLUSTRATIVE MASTERPLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 5.10 - APPLICATION SITE 3 ILLUSTRATIVE MASTERPLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.1 - ZONE OF THEORETICAL VISIBILITY Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.3 - TOPOGRAPHY PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.5 - LANDSCAPE CHARACTER CONTEXT Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.8 - LANDSCAPE OPPORTUNITIES AND CONSTRAINTS PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.4 - LANDSCAPE PLANNING POLICY CONTEXT Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.2 - PHOTOVIEWPOINTS LOCATION PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 8.6 - RECEPTOR PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 9.1 - SITE 1 ECOLOGICAL FEATURES PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 9.2 - SITE 2 AND 3 ECOLOGICAL FEATURES PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 9.4 - SITE 2 AND 3 OUTLINE MITIGATION PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 9.3 - SITE 1 OUTLINE MITIGATION PLAN Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 15.1 - NOISE MONITORING LOCATIONS (RESI-RETAIL) Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 15.2 - DAY NRA (RESI-RETAIL) Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 15.3 - NIGHT NRA (RESI-RETAIL) Planning Application (inc initial correspondence) · 25 Nov 2019
  • FIGURE 16.1 - CUMULATIVE SITES MAP Planning Application (inc initial correspondence) · 25 Nov 2019
  • GLOSSARY Planning Application (inc initial correspondence) · 25 Nov 2019
  • FEE CALCULATION Planning Application (inc initial correspondence) · 25 Nov 2019
  • SUBMISSION CONFIRMATION Planning Application (inc initial correspondence) · 25 Nov 2019
  • COVER LETTER 22.11.19 Planning Application (inc initial correspondence) · 25 Nov 2019

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Chorley granted permission on 13 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land To The West Side Of Blackburn Road Chorley

    24/00763/MNMA Submitted 4 Sep 2024 50 yards away

    Minor non material amendment to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works) involving changes to levels and development platforms.

    Decided Amendments 8 docs
  • Land To The West Side Of Blackburn Road Chorley

    26/00167/DIS Submitted 19 Feb 2026 50 yards away

    100% historically approved · decision due ~16 Apr

    Application to discharge conditions 32 (Car Park Management Strategy) and 33 (Travel Plan) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Awaiting decision Conditions 6 docs
  • Land To The West Side Of Blackburn Road Chorley

    25/00196/DIS Submitted 26 Feb 2025 100 yards away

    100% historically approved · decision due ~23 Apr

    Application to discharge condition 17 (biodiversity net gain plan) parts a), b), and c) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Awaiting decision Conditions 21 docs
  • Land To The West Side Of Blackburn Road Chorley

    25/01212/DIS Submitted 12 Dec 2025 100 yards away

    Application to discharge condition 14 (Levels - Phase 2b) attached to planning permission 22/01243/FULMAJ (Detailed planning application for an employment development (comprising a range of buildings in Use Classes E(g), B2 and B8), including new access of A674, internal circulation, parking, servicing, landscaping and ancillary works)

    Granted Conditions 6 docs
  • 176 Blackburn Road Chorley PR6 8TP

    23/00120/FUL Submitted 9 Feb 2023 200 yards away

    Section 73 application to vary condition no.3 attached to reserved matters consent ref: (Reserved matters application (details of access, appearance, landscaping, layout and scale) pursuant to outline planning permission 21/00294/OUT (Outline planning application for a proposed detached dwelling following demolition of existing residential extension) to make changes to the allow the construction of a garage at basement level to the side elevation of the approved dwelling

    Granted Full applications New dwelling Extension +1 13 docs
    Domestic
  • 126 Blackburn Road Chorley PR6 8TJ

    21/01041/PDE Submitted 27 Aug 2021 300 yards away

    Notification of a proposed single storey rear extension measuring 6m depth, with eaves height of 2.8m, and a maximum height of 2.8m (following demolition of existing single storey rear extension)

    Granted Extension Demolition 10 docs
    Small domestic

In Chorley

  • 26/00177/PIP Granted

    Land At Orchard Heys Farm Park Road Coppull Chorley PR7 5AH

    Application for Permission in Principle for up to 6no. dwellinghouses

    Received 20 Feb, published by the council 21 Jul 2026 Outline
  • 26/00012/PIP Granted

    37 Preston Road Coppull Chorley PR7 5HS

    Permission in principle application for the erection of four dwellinghouses

    Received 7 Jan, published by the council 21 Jul 2026 Outline
  • 26/00699/PIP Awaiting decision

    Land Adjacent To Moorglen Sandy Lane Mawdesley Ormskirk L40 2QB

    Permission in principle application for the construction of one dwelling

    Received 7 Aug, published by the council 11 Aug 2026 Outline
  • 26/00690/PIP Awaiting decision

    Rigby House Farm The Common Adlington Chorley PR7 4DS

    Permission in principle application for 1 Dwelling

    Received 5 Aug, published by the council 11 Aug 2026 Outline
  • 26/00682/PIP Awaiting decision

    Land And Building Adjoining Carr Lane, Croston, PR26 9RE

    Permission in principle application for the erection of 1 dwelling and the formation of a residents parking area, following demolition of existing buildings.

    Received 3 Aug, published by the council 11 Aug 2026 Outline