Planning application
Oak Tree Barn Southbrook Road West Ashling Chichester West Sussex PO18 8DN
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
2 no. dormers and 1 no. rooflight on south elevation and 1 no. rooflight on west elevation.
As published by the council, reference 26/01212/DOM
Application record
- Reference
- 26/01212/DOM
- Status
- Permit
- Decision
- Granted As published: PERMIT
- Received
- 2 Jun 2026
- Validated
- 11 Jun 2026
- Decided
- 30 Jul 2026
- Ward
- Lavant
- Parish
- Funtington
- Decision by
- Delegated
- Postcode
- PO18 8DN
Timeline
Dates from the published record
-
2 Jun 2026
Received by Chichester
-
11 Jun 2026
Validated
Checked as complete and ready for consideration.
-
30 Jul 2026
Decision issued: PERMIT
-
31 Jul 2026
Added to PlanIndex
-
8 Aug 2026
Status changed to Permit
Previously Pending Consideration.
Who's behind it
Company information only, from the register and Companies House
Architectural & Associated Services Ltd Agent, an architecture practice registered in Haslemere
Active · incorporated 2015 · Haslemere
14 applications on PlanIndex · across 7 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
- PROOF OF DESCRIPTION CHANGE 28/7/26
- PROPOSED ELEVATIONS
- PROPOSED LOCATION PLAN AND BLOCK PLAN
- CDC ENVIRONMENTAL STRATEGY
- APPLICATION FORM
- PHASE 2 BAT EMERGENCE SURVEY
- PHASE 1 DAYTIME BAT ASSESSMENT
- EXISTING FIRST FLOOR PLAN
- EXISTING ROOF PLANS
- EXISTING ELEVATIONS
- EXISTING GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED ROOF PLANS
- PROPOSED ELEVATIONS
- PROPOSED GROUND FLOOR PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Chichester granted permission on 30 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Chichester's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Malt Barn House Southbrook Road West Ashling West Sussex PO18 8DN
100% historically approved · decision due ~31 Aug
Notification of intention to reduce south sector by 2m (creating a 1m gap between the neighbours roof line and the tree) on 1 no Monkey Puzzle tree (T1), fell 1 no. multi-stemmed Conifer tree (T2) and remove 1 no. lowest limb on the south sector of 1 no. Walnut tree (T3).
Decided Trees -
Red House Southbrook Road West Ashling West Sussex PO18 8DN
100% historically approved · decision due ~8 Oct
Notification of intention to fell 2 no. Leyland Cypress trees (T1 & T2).
Decided Trees -
Old Monks House, Cottage Annexe Southbrook Road West Ashling West Sussex PO18 8DN
91% historically approved · decision due ~25 Nov
Ground floor extension and reconfiguration of roof void with associated parking.
Awaiting decision Extension -
Ashling Cricket Club Cricket Pavilion Down Street West Ashling West Sussex PO18 8DS
100% historically approved · decision due ~23 Jul
Notification of intention to crown reduce lower to mid crown on north-western sector by 6m and remove 1 no. lowest branch on southern sector (over building) on 1 no. Lime tree (T1).
Decided Trees -
2 Brook Cottages Mill Pond Lane West Ashling Chichester West Sussex PO18 8DY
Notification of intention to fell 1 no. Silver Birch tree.
Granted Trees 7 docs