Planning application

Former Site Of Avenue House Avenue Road Whittington Moor Derbyshire

Withdrawn Chesterfield CHE/22/00829/FUL Full Application

Works: New dwelling

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Two 3 storey blocks of 18 one bedroom sheltered housing flats (Use Class C2) and associated communal areas, plus car parking, pedestrian and cycle access and landscaped garden areas

As published by the council, reference CHE/22/00829/FUL

Application record

Reference
CHE/22/00829/FUL
Type
Full Application
Status
Decided
Decision
withdrawn
Received
13 Dec 2022
Validated
14 Dec 2022
Decided
16 Feb 2023
Ward
Moor
Decision by
Committee Decision
Postcode
S41 8TA

Timeline

Dates from the published record

  1. 13 Dec 2022

    Received by Chesterfield

  2. 14 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 16 Feb 2023

    Decision issued: withdrawn

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Chesterfield

  • CHE/26/00769/FUL Awaiting decision

    Cannon Mill Dock Walk Chesterfield Derbyshire S40 2AB

    Change of use to office accommodation, external alterations and associated works

    1 Sep 2026 Full applications
  • 4 Station Road Barrow Hill Chesterfield Derbyshire S43 2NL

    Erection of a rear dormer roof and further works to the rear, to facilitate change of use to form a separate ground floor shop and 2 upper floor flats

    17 Oct 2025 Full applications
  • Field To The East Of Hundall Lane Old Whittington Chesterfield Derbyshire

    Installation of a menage and extension to hardcore outside of existing stables

    27 Jan 2026 Full applications
  • CHE/26/00749/FUL Awaiting decision

    Barrow Hill Railway Centre Campbell Drive Barrow Hill Chesterfield Derbyshire S43 2PR

    Alterations to roofing and walling, with repairs to surface water drainage system

    24 Aug 2026 Full applications
  • 6-22 Lordsmill Street Chesterfield Derbyshire S41 7RW

    Change of use from warehouse, offices and retail to individual units comprising Use Class E commercial units and B8 warehousing and retention of external alterations

    17 Apr 2026 Full applications