Planning application
6 Gerrard Avenue Great Sutton Ellesmere Port Cheshire CH66 4TT
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Rear Conservatory Extension
As published by the council, reference P/2006/101/LE/563
Application record
- Reference
- P/2006/101/LE/563
- Type
- Full Application
- Status
- Approved
- Decision
- Application Permitted
- Received
- 10 Aug 2006
- Validated
- 10 Aug 2006
- Decided
- 4 Oct 2006
- Ward
- Ledsham
- Decision by
- Delegated Decision
- Postcode
- CH66 4TT
Timeline
Dates from the published record
-
10 Aug 2006
Received by Cheshire West and Chester
-
4 Oct 2006
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
7 Gerrard Avenue Great Sutton Ellesmere Port Cheshire CH66 4TT
Two Storey Side Extension
Granted Extension 3 docs -
Sutton Hall Water Works Glencoe Road Great Sutton Ellesmere Port CH66 4NA
90% historically approved · decision due ~20 Oct
The installation of 2no. antennas and 1no. GPS module, and the installation of 1no. cabinet within the existing equipment building; plus, ancillary equipment works (Your ref UUW_CH109)
Decided -
12 Skipton Drive Little Sutton Ellesmere Port CH66 4SR
Single storey front extension. Single storey side and rear extension to include conversion of garage to gym/utility room
Granted Full applications Extension 6 docsSmall domestic -
8 Hemsworth Avenue Little Sutton Ellesmere Port CH66 4SG
Single storey front and side extension.
Granted Full applications Extension 9 docsSmall domestic -
14 Hemsworth Avenue Little Sutton Ellesmere Port CH66 4SG
Single storey side extension
Granted Full applications Extension 8 docsSmall domestic -
Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port Cheshire
Reserved Matters application for 256 dwellings forming part of Phase 3 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT (for a total of up to 2000 dwellings and associated development)
Granted Reserved matters 156 docsMajor scheme
Other full applications applications
In Cheshire West and Chester
-
26/02662/FUL Awaiting decision
2 Upton Park Upton Chester CH2 1DG
Alterations to existing extension, including replacement of render with brickwork and roof alterations
-
26/02656/FUL Awaiting decision
13 Ince Drive Farndon Chester CH3 6NS
Erection of porch to front
-
26/02643/FUL Awaiting decision
21 York Drive Mickle Trafford Chester CH2 4DT
Single storey front and rear extensions
-
26/02636/FUL Awaiting decision
Southmead Mill Lane Willaston Neston CH64 1RL
Detached garage
-
26/02638/FUL Awaiting decision
107 Pooltown Road Whitby Ellesmere Port CH65 7AF
Change of use of dwelling to children's home for 2 children