Skip to content
PlanIndex Get alerts
Menu

Planning application

Barn Owl Farm Barnhouse Lane Barrow Chester CH3 7JY

Awaiting decision Cheshire West and Chester 26/02461/S73

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Relates to 26/01257/FUL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Single-storey rear extension with terrace balcony above. Variation to conditions 1 and 2 and removal of condition 4 of planning permission 26/01257/FUL (increasing the height of the roof to the side extension (when viewed from the rear) to provide the required screening to the balcony.

As published by the council, reference 26/02461/S73

Application record

Reference
26/02461/S73
Status
Awaiting decision
Received
4 Aug 2026
Validated
4 Aug 2026
Postcode
CH3 7JY

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 3 applications since 2025.

  • 26/01257/FUL Decided

    Barn Owl Farm Barnhouse Lane Barrow Chester CH3 7JY

    Single-storey rear extension with terrace balcony above

    Submitted 24 Apr 2026 Full applications
  • 25/03781/FUL Decided

    Barn Owl Farm Barnhouse Lane Barrow Chester CH3 7JY

    Single-storey side and rear extension with first floor terrace balcony formed above, alterations first floor rear windows

    Submitted 3 Dec 2025 Full applications

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by Cheshire West and Chester

  2. 23 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/01257/FUL Decided

    Barn Owl Farm Barnhouse Lane Barrow Chester CH3 7JY

    Single-storey rear extension with terrace balcony above

    Submitted 24 Apr 2026 Full applications

What happens while it is decided

This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester's median decision took 58 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Cheshire West and Chester's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Barn Owl Farm Barnhouse Lane Barrow Chester CH3 7JY

    26/01257/FUL Submitted 24 Apr 2026 0m away

    92% historically approved · decision due ~19 Jun

    Single-storey rear extension with terrace balcony above

    Decided Full applications Extension
    Small domestic
  • Barn Owl Farm Barnhouse Lane Barrow Chester CH3 7JY

    25/03781/FUL Submitted 3 Dec 2025 0m away

    92% historically approved · decision due ~28 Jan

    Single-storey side and rear extension with first floor terrace balcony formed above, alterations first floor rear windows

    Decided Full applications Extension Windows or glazing
    Small domestic
  • Grange Farm Barnhouse Lane Barrow Chester CH3 7JY

    25/03956/FUL Submitted 17 Dec 2025 229m away

    92% historically approved · decision due ~11 Mar

    Conversion of barn to ancillary accommodation

    Awaiting decision Full applications 10 docs
  • Grange Farm Barnhouse Lane Barrow Chester CH3 7JY

    25/02546/FUL Submitted 15 Aug 2025 243m away

    92% historically approved · decision due ~17 Dec

    Proposed Stables, Menage, All-weather Turnout and Agricultural Building

    Awaiting decision Full applications 17 docs