Planning application
Poolhead Oulton Mill Lane Rushton Tarporley CW6 9DX
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Single storey rear extension to replace existing conservatory
As published by the council, reference 26/02292/FUL
Application record
- Reference
- 26/02292/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 22 Jul 2026
- Validated
- 22 Jul 2026
- Ward
- Tarporley
- Parish
- Rushton
- Postcode
- CW6 9DX
Timeline
Dates from the published record
-
22 Jul 2026
Received by Cheshire West and Chester
-
13 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Pool End Cottage Oulton Mill Lane Rushton Tarporley CW6 9DT
Single storey infill extension to link into garage conversion, two storey front and first floor rear extension and front porch
Granted Full applications Extension 9 docsSmall domestic -
Land At Oulton Mill Lane Rushton Tarporley
Steel framed agricultural storage shed
Refused Other 8 docsSmall domestic -
Cotebrook Wastewater Treatment Works A49 Tarporley Cheshire
New ferric storage and dosing kiosk
Granted Full applications 17 docs -
Land Adjacent 2 Sandiford House Tarporley Road Utkinton Tarporley CW6 9YU
Construction of two dwellings
Withdrawn Full applications 9 docsSeveral homes -
Land At Tarporley Road Delamere Northwich
Erection of detached dwelling
Refused Outline New dwelling 46 docsDomestic
Other full applications applications
In Cheshire West and Chester
-
26/02799/FUL Awaiting decision
Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER
Drilling of boreholes and installation of covers for groundwater monitoring purposes.
-
26/01813/FUL Granted
25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD
Two storey side extension with single storey front porch extension
-
26/01781/FUL Granted
Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH
Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.
-
26/01635/FUL Granted
26 Arrowcroft Road Guilden Sutton Chester CH3 7ES
Single storey rear/side extension
-
26/01833/FUL Granted
6 Oaklands Crescent Tattenhall Chester CH3 9QT
Two storey side extensions above existing garage and single storey rear extension and render to all walls.