Planning application
26/01489/FUL
1 Quarry Close Hooton Ellesmere Port CH66 7PE
Proposal
Extension of fence
As published by the council, reference 26/01489/FUL
Timeline
Dates from the published record
-
12 May 2026
Received by Cheshire West and Chester
-
15 May 2026
Validated
Checked as complete and ready for consideration.
-
9 Jul 2026
Decision issued: Approval
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/03624/S73 Awaiting decision
Land At Former Roften Works Hooton Road Hooton Ellesmere Port
Removal of conditions 22 (improvements to junction of A41/B5133) and 23 (implement highway improvements) of 17/02741/FUL (Residential development comprising of 265 residential units and a care home together with access from Hooton Road, car parking, landscaping and open space)
-
26/00653/DIS Granted
21 Valentine Street Hooton Ellesmere Port CH66 7PL
Discharge of condition 20 (HMMP) of planning application 25/01072/FUL
-
26/00375/DIS Awaiting decision
21 Valentine Street Hooton Ellesmere Port CH66 7PL
Discharge of conditions 3 (materials), 7 (sound insulation scheme) 8 (Ventilation and extraction noise control), 9 (external lighting), 10 (scheme to control the emissions of fumes and odour), 15 (pedestrian crossing provision), 16 (contamination), 19 (sustainable drainage), 21 (Bat and Bird Boxes) of planning permission 25/01072/FUL
-
26/00855/BGP Granted
21 Valentine Street Hooton Ellesmere Port CH66 7PL
Discharge of note 2 (BGP ) of planning permssion 25/01072/FUL
-
26/02213/OUT Awaiting decision
Land At Waterworks Lane Hooton Ellesmere Port
Construction of a crematorium and all ancillary infrastructure including, but not limited to, new access, car parking, drainage, memorial gardens and incidental landscaping with hard surfacing on land at Waterworks Lane, Hooton, Ellesmere Port. (All matters reserved apart from access)
Other full applications applications
In Cheshire West and Chester
-
26/02343/TPO Awaiting decision
Lostock Tiny Tots Pre-School The Vicarage Station Road Lostock Gralam Northwich CW9 7PS
Horse Chestnut (T1) - Reduce longer, heavier branches by 1m to 3m as appropriate to reduce the risk of major failures
-
26/01554/FUL Granted
4 West Vale Neston CH64 9SF
Erection of a rear and side two-storey extension
-
26/00316/FUL Withdrawn
Land At Tilston Road Malpas Cheshire
Erection of 2no. detached dwellinghouses and associated access road, landscaping and boundary treatments.
-
26/00572/FUL Granted
Motte Manor Chorlton Lane Chorlton Malpas SY14 7EN
Replace front and side boundary fence with a brick wall and retaining timber panels to the remaining side and rear boundaries.
-
26/02299/FUL Awaiting decision
Forum Building Princess Street Chester
Removal of existing artwork through overpainting with white masonry paint and installation of a replacement UV-printed PVC banner fixed directly to the Forum building wall overlooking Exchange Square by Chester Market.