Planning application
26/01018/FUL
6 and 8 Faulkner Street Chester CH2 3BD
Proposal
Installation of solar panels to roof of existing flat and lower roof of shop
As published by the council, reference 26/01018/FUL
Timeline
Dates from the published record
-
31 Mar 2026
Received by Cheshire West and Chester
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20/03629/FUL Granted
5 Faulkner Street Chester CH2 3BD
Change of use from shop to a specialist craft beer, wine and spirits bar (A4)
-
25/03989/FUL Awaiting decision
59 Hoole Road Chester CH2 3NJ
Change of use of the former B&B to a residential dwelling, demolition of the rear outrigger and construction of single-storey rear extension incorporating an enclosed rooftop balcony.
-
25/03868/FUL Awaiting decision
The Limes 12 Hoole Road Chester CH2 3NJ
Reconfiguration of 6 one bed apartments to form three 2-bed apartments and two 1-bed apartments (5 apartments).
-
25/03570/FUL Awaiting decision
35 - 37 & 37A Faulkner Street Chester CH2 3BD
Ground-floor rear extension and addition of a door to the front of the property and addition of a window on the first-floor elevation of the rear of the property.
-
26/00529/OUT Awaiting decision
Land At The Black Cab Garage Site School Street Chester Cheshire
Outline Application for new build residential development with all matters reserved.
-
26/01711/DIS Granted
15 Hamilton Street Chester CH2 3JG
Discharge of conditions 3 (materials), 4 (roof lights), 8 (door detail) and 9 (extractor vents) of 26/00232/LBC
Other full applications applications
In Cheshire West and Chester
-
26/02343/TPO Awaiting decision
Lostock Tiny Tots Pre-School The Vicarage Station Road Lostock Gralam Northwich CW9 7PS
Horse Chestnut (T1) - Reduce longer, heavier branches by 1m to 3m as appropriate to reduce the risk of major failures
-
26/01554/FUL Granted
4 West Vale Neston CH64 9SF
Erection of a rear and side two-storey extension
-
26/00316/FUL Withdrawn
Land At Tilston Road Malpas Cheshire
Erection of 2no. detached dwellinghouses and associated access road, landscaping and boundary treatments.
-
26/00572/FUL Granted
Motte Manor Chorlton Lane Chorlton Malpas SY14 7EN
Replace front and side boundary fence with a brick wall and retaining timber panels to the remaining side and rear boundaries.
-
26/02299/FUL Awaiting decision
Forum Building Princess Street Chester
Removal of existing artwork through overpainting with white masonry paint and installation of a replacement UV-printed PVC banner fixed directly to the Forum building wall overlooking Exchange Square by Chester Market.