Planning application
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Phase 1 - Removal of plant and equipment from DTB building (DTB Building to remain), Phase 2 - Removal of plant, equipment and then demolition of steel framed clad structures (Reactor Hall, Sorting Hall Bunker Hall and Loading Hall)
As published by the council, reference 26/00455/DEM
Application record
- Reference
- 26/00455/DEM
- Status
- Decided
- Received
- 11 Feb 2026
- Validated
- 17 Feb 2026
- Postcode
- CW9 7NU
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 7 applications since 2018: 6 approved, 0 refused.
-
26/01251/FUL Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Extension of the Northwich Biogas Facility Anaerobic Digestion plant including new infrastructure for biogas conversion to biomethane for injection to the gas grid
-
26/00977/NMA Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Non Material Amendment to 16/01436/S73 (amend site layout plan of Condition 2 to include addition of plant; heat exchanger, cooler, new pipes and pipe racks, pipe support structure, ammonia scrubber and carbon absorber)
-
19/01632/DIS Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Full Discharge of Condition 15 of permission 18/02411/FUL for the Remediation Verification of the approved Remediation Strategy
-
19/01032/DIS Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Discharge of Condition 11 (External Lighting ) of Planning Permission 18/02411/FUL for extensions to an existing Waste Management Facility
-
19/01033/DIS Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Discharge of Condition 10 (Odour Management Plan) of Planning Permission 18/02411/FUL for extensions to an existing Waste Management Facility
-
18/02411/FUL Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Extensions to existing Waste Management Facility
Timeline
Dates from the published record
-
11 Feb 2026
Received by Cheshire West and Chester
-
17 Feb 2026
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
After the decision
Cheshire West and Chester has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Cheshire West and Chester's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Non Material Amendment to 16/01436/S73 (amend site layout plan of Condition 2 to include addition of plant; heat exchanger, cooler, new pipes and pipe racks, pipe support structure, ammonia scrubber and carbon absorber)
Granted Amendments -
Lostock Sustainable Energy Plant Ltd Works Lane Northwich CW9 7NU
Non-material amendment to 10/00691/DECC (vary the wording of condition 17 to approve an updated 'Overview of Materials' document in order to amend the approved cladding colour to the Air Cooled Condenser (ACC))
Granted Amendments -
Wincham Wharf Boat Builders 220 Manchester Road Lostock Graham Northwich Cheshire CW9 7NT
Install electronic communiations apparatus. Ref: 11454/AD/AIRSCALE
Decided -
Land At The Junction of Manchester Road and Griffiths Road Lostock Gralam Northwich Cheshire
Existing use of the site and building as a residential dwelling
Refused Lawful development 6 docsDomestic -
Wincham Wharf Boat Builders 220 Manchester Road Lostock Graham Northwich Cheshire CW9 7NT
Upgrade existing telecommunications apparatus Ref: VRO036/11454
Decided Telecoms 2 docs -
Land At Manchester Road Lostock Gralam Northwich
92% historically approved · decision due ~12 Oct
Construction of new dwelling
Awaiting decision New dwelling 8 docsDomestic