Skip to content
PlanIndex Get alerts
Menu

Planning application

The Pits 709 Chester Road Great Sutton Ellesmere Port CH66 2LW

Refused Cheshire West and Chester 21/01293/FUL Full applications

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Erection of front dormer, single storey front, side/rear extension, alterations to windows/doors, installation of rooflights.

As published by the council, reference 21/01293/FUL

Application record

Reference
21/01293/FUL
Category
Full applications
Status
Refused
Decision
Refusal
Received
22 Mar 2021
Validated
21 Apr 2021
Decided
10 Nov 2023
Ward
Sutton Villages
Decision by
Delegated Decision
Postcode
CH66 2LW

Timeline

Dates from the published record

  1. 22 Mar 2021

    Received by Cheshire West and Chester

  2. 21 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 10 Nov 2023

    Decision issued: Refusal

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Cheshire West and Chester

  • 26/02662/FUL Awaiting decision

    2 Upton Park Upton Chester CH2 1DG

    Alterations to existing extension, including replacement of render with brickwork and roof alterations

    24 Aug 2026 Full applications
  • 26/02656/FUL Awaiting decision

    13 Ince Drive Farndon Chester CH3 6NS

    Erection of porch to front

    21 Aug 2026 Full applications
  • 26/02643/FUL Awaiting decision

    21 York Drive Mickle Trafford Chester CH2 4DT

    Single storey front and rear extensions

    20 Aug 2026 Full applications
  • 26/02636/FUL Awaiting decision

    Southmead Mill Lane Willaston Neston CH64 1RL

    Detached garage

    20 Aug 2026 Full applications
  • 26/02638/FUL Awaiting decision

    107 Pooltown Road Whitby Ellesmere Port CH65 7AF

    Change of use of dwelling to children's home for 2 children

    20 Aug 2026 Full applications