Skip to content
PlanIndex Get alerts
Menu

Planning application

Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

Granted Cheshire West and Chester 21/01170/FUL Other

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Post-operational clean out, decommissioning, demolition and land quality appraisal of the B550 incinerator complex

As published by the council, reference 21/01170/FUL

Application record

Reference
21/01170/FUL
Type
Other
Status
Approved
Decision
Granted As published: Approval
Received
16 Mar 2021
Validated
16 Mar 2021
Decided
20 Jul 2021
Ward
Saughall And Mollington
Parish
Capenhurst And Ledsham
Decision by
Delegated Decision
Postcode
CH1 6ER

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 7 applications since 2019: 7 approved, 0 refused.

  • 21/00196/DIS Granted

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

    Discharge of condition 3 (site investigation) on planning permission 19/04512/FUL (Construction and operation of a modular plant room compound with associated external plant and equipment, fencing and hard landscaping)

    Decided 21 May 2021 Conditions
  • 20/02988/FUL Granted

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

    Proposed fencing upgrade (steel palisade fence (Moss Green) 3m high with razor wire above (total height 4.06m)

    Decided 13 Oct 2020 Full applications
  • 20/01317/NMA Granted

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

    Non Material Amendment to 17/01919/FUL (demolition of existing substation and dog kennel building and construction of two new substations and two new choke buildings with new fencing, access, hard landscaping and ancillary development) (Amendment to Condition 3 (Construction Environmental Management Plan) with further amendment following 18/04324/NMA to permit the use of an alternative construction access route including additional temporary parking area)

    Decided 18 May 2020 Conditions
  • 19/04512/FUL Granted

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

    Construction and operation of a modular plant room compound with associated external plant and equipment, fencing and hard landscaping

    Decided 28 May 2020 Full applications
  • 19/02491/DIS Granted

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

    Discharge of Condition 7 (Travel Plan) and Condition 8 (Archaeological) of 18/02191/S73 of planning permission 18/02191/S73 (Tails Management Facility for the deconversion of Tails (depleted Uranium Hexafluoride) for long terms safe storage)

    Decided 3 Oct 2019 Conditions
  • 19/01343/DIS Granted

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester Cheshire CH1 6ER

    Discharge of condition 5 (ground investigation) of planning permission 18/02191/S73 (Tails Management Facility for the deconversion of Tails (depleted Uranium Hexafluoride) for long terms safe storage)

    Decided 25 Jan 2021 Conditions

Timeline

Dates from the published record

  1. 16 Mar 2021

    Received by Cheshire West and Chester

  2. 20 Jul 2021

    Decision issued: Approval

  3. 24 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cheshire West and Chester granted permission on 20 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    25/03748/FUL Submitted 1 Dec 2025 200 yards away

    93% historically approved · decision due ~28 Oct

    Erection of security fence.

    Awaiting decision Full applications
    Small domestic
  • Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    26/00813/FUL Submitted 12 Mar 2026 200 yards away

    Construction of 3m high and 300mm wide freestanding prefabricated concrete shield wall to provide radiological shielding safety function

    Granted Full applications
  • Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    26/02799/FUL Submitted 3 Sep 2026 200 yards away

    93% historically approved · decision due ~29 Oct

    Drilling of boreholes and installation of covers for groundwater monitoring purposes.

    Awaiting decision Full applications
  • Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    25/02408/NMA Submitted 4 Aug 2025 200 yards away

    86% historically approved · decision due ~10 Oct

    Non Material Amendment to 21/02323/FUL (Alterations and External Works (including Demolition) to the E22 Building, parking area and associated works) (changes along the E22 Building North Elevation - relocated barrier, relocated Vertical Air Receiver, HVAC louvre added, additional small louvre added, existing concrete wall extended, switchboard moved inside the building, new entrance steps and ramp, main pedestrian aluminium and glazed entrance doors arrangement updated, cladding repainted) (changes Along the E22 Building West Elevation - 2 Diesel Generators increased in size, concrete wall removed, existing concrete wall extended, cladding repainted and existing louvres to be repaired and not replaced by new cladding)

    Decided Amendments Demolition Windows or glazing
  • Land Adjacent To Capenhurst Substation Capenhurst Lane Capenhurst Chester CH1 6HE

    26/00485/S73 Submitted 17 Feb 2026 250 yards away

    95% historically approved · decision due ~14 Apr

    Development of Battery Storage Facility and ancillary equipment on land to the south of National Grid Sub-Station, amendment to planning permission 20/04767/FUL - variation of Condition 2 (Approved Plans), condition 6 (Sustainable Drainage Scheme), condition 7 (Existing and Proposed Levels), condition 9 (Landscaping), and condition 11 (Habitat Management Plan) of planning application 22/02044/FUL

    Awaiting decision Conditions 25 docs
  • Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    25/02611/FUL Submitted 20 Aug 2025 350 yards away

    93% historically approved · decision due ~19 Nov

    Installation of 2no. attenuation tanks to accommodate rainwater harvesting and road surface water

    Awaiting decision Full applications 15 docs

In Cheshire West and Chester

  • 26/02638/FUL Granted

    107 Pooltown Road Whitby Ellesmere Port CH65 7AF

    Change of use of dwelling to children's home for 2 children

    Received 20 Aug, published by the council 25 Aug 2026 Full applications
  • 26/02576/FUL Granted

    1 Meadowbank Drive Little Sutton Ellesmere Port CH66 4JF

    Single storey rear extension

    Received 17 Aug, published by the council 27 Aug 2026 Full applications
  • 26/01432/FUL Granted

    Cromwell Court Tarvin Road Frodsham WA6 6XN

    Demolition of existing shed. Erection of single storey outbuilding

    Received 12 May, published by the council 21 Jul 2026 Full applications
  • 26/02991/CAT Awaiting decision

    Hartford Bowls and Tennis Club Chester Road Northwich CW8 1LW

    Oak (T1) - Reduce by approximately 1m and remove major deadwood

    Received 18 Sep, published by the council 24 Sep 2026 Full applications
  • 26/00991/FUL Granted

    The Stray School Lane Neston CH64 7TX

    Installation of a 56 solar PV array within the grounds of the property