Planning application
Land At End of Farm Road Rudheath Northwich Cheshire
Relates to 19/04057/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 10 (Landscaping) of planning permission 19/04057/FUL
As published by the council, reference 21/00302/DIS
Application record
- Reference
- 21/00302/DIS
- Type
- Conditions
- Status
- Approved
- Decision
- Granted As published: Approval
- Received
- 22 Jan 2021
- Validated
- 22 Jan 2021
- Decided
- 11 Mar 2021
- Ward
- Rudheath
- Parish
- Rudheath
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
22 Jan 2021
Received by Cheshire West and Chester
-
11 Mar 2021
Decision issued: Approval
-
24 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
19/04057/FUL Granted
Lostock Gralam Farm Road Rudheath Northwich Cheshire
The development of an underground electrical connection between the Lostock Sustainable Energy Plant (LSEP) and the Scottish Power Energy Networks 132kV distribution system in Lostock Gralam.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 11 March 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lostock Gralam Farm Road Rudheath Northwich Cheshire
Discharge of condition 4 of planning permission 19/04057/FUL ( The development of an underground electrical connection between the Lostock Sustainable Energy Plant (LSEP) and the Scottish Power Energy Networks 132kV distribution system in Lostock Gralam).
Granted Conditions 19 docs -
Lostock Gralam Farm Road Rudheath Northwich Cheshire
The development of an underground electrical connection between the Lostock Sustainable Energy Plant (LSEP) and the Scottish Power Energy Networks 132kV distribution system in Lostock Gralam.
Granted Full applications 32 docs -
Lostock Youth Club Works Lane Northwich CW9 7NW
Erection of single storey side extension to create store room
Granted Full applications Extension 10 docsSmall domestic -
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Non Material Amendment to 16/01436/S73 (amend site layout plan of Condition 2 to include addition of plant; heat exchanger, cooler, new pipes and pipe racks, pipe support structure, ammonia scrubber and carbon absorber)
Granted Amendments -
Lostock Sustainable Energy Plant Ltd Works Lane Northwich CW9 7NU
Non-material amendment to 10/00691/DECC (vary the wording of condition 17 to approve an updated 'Overview of Materials' document in order to amend the approved cladding colour to the Air Cooled Condenser (ACC))
Granted Amendments -
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
92% historically approved · decision due ~14 Apr
Phase 1 - Removal of plant and equipment from DTB building (DTB Building to remain), Phase 2 - Removal of plant, equipment and then demolition of steel framed clad structures (Reactor Hall, Sorting Hall Bunker Hall and Loading Hall)
Decided Demolition
Other condition discharge and variation applications
In Cheshire West and Chester
-
26/01402/DIS Refused
Upton Lea Urgent Response Centre The Countess of Chester Hospital Liverpool Road Upton Chester CH2 1HJ
Discharge of condition 9 (Phase IV Completion Report) of 24/01970/FUL
-
26/02789/BGP Awaiting decision
Roadchef Chester Motorway Service Area Hapsford Interchange Elton Chester CH2 4QZ
Discharge of Note 3 (BGP) of planning permission 24/03831/FUL
-
26/02993/TPO Awaiting decision
73 Beach Road Hartford Northwich CW8 3AB
Oak (T1) - Sever ivy, remove major deadwood, review condition in 12 months. Oak (T2) - Weight reduce 1 heavier limb over road by approximately 2m and crown lift over road to approximately 6m. Oak (T3) - Reduce 1 large limb over driveway by approximately 2m to help prevent risk of failure. Oak (T4) - Reduce crown by approximately 1-2m and remove any major deadwood.
-
26/02881/DIS Awaiting decision
32A High Street Northwich CW9 5BJ
Discharge of conditions 4 (Noise Impact Report) and 5 (Kitchen oudour assessment) of planning permission 25/03660/FUL
-
26/02648/FUL Awaiting decision
Highgrove Kingswood Lane Saughall Chester CH1 6DE
Retrospective planning application for the retention and modification of rear dormer extension.