Planning application
Ash Tree House Tattenhall Lane Tattenhall Chester Cheshire CH3 9NH
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Relates to 20/01499/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two storey rear extension, single storey side extension, and alterations (resubmission of 20/01499/FUL)
As published by the council, reference 20/02557/FUL
Application record
- Reference
- 20/02557/FUL
- Type
- Full
- Status
- Approved
- Decision
- Granted As published: Approval
- Received
- 20 Jul 2020
- Validated
- 20 Jul 2020
- Decided
- 17 Sep 2020
- Ward
- Tattenhall
- Parish
- Tattenhall
- Decision by
- Delegated Decision
- Postcode
- CH3 9NH
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 2 applications since 2020: 1 approved, 0 refused.
-
20/01499/FUL Withdrawn
Ash Tree House Tattenhall Lane Tattenhall Chester Cheshire CH3 9NH
Two storey extensions to front and side, single storey extensions to side and rear, alterations and erection of stable block
Timeline
Dates from the published record
-
20 Jul 2020
Received by Cheshire West and Chester
-
17 Sep 2020
Decision issued: Approval
-
13 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
20/01499/FUL Withdrawn
Ash Tree House Tattenhall Lane Tattenhall Chester Cheshire CH3 9NH
Two storey extensions to front and side, single storey extensions to side and rear, alterations and erection of stable block
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 17 September 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ash Tree House Tattenhall Lane Tattenhall Chester Cheshire CH3 9NH
Two storey extensions to front and side, single storey extensions to side and rear, alterations and erection of stable block
Withdrawn Full applications Extension 8 docsSmall domestic -
2 Squarehouse Barns Tattenhall Lane Tattenhall Chester Cheshire CH3 9NH
Change of use from a residential to a holiday let
Withdrawn Full applications
Other full applications
In Cheshire West and Chester
-
25/01159/FUL Granted
Land At Canaan Farm Bell O The Hill Road Tushingham Cum Grindley Malpas SY13 4QR
Demolition of existing dwelling and the erection of a new dwelling
-
25/03900/FUL Granted
Garden Lane Medical Centre 17 and 19 Garden Lane Chester CH1 4EN
Side extension to No.19 and Removal of shared canopy. Alterations to windows and doors for both No 17 and 19, including replacement of all windows of No.19
-
26/01251/FUL Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Extension of the Northwich Biogas Facility Anaerobic Digestion plant including new infrastructure for biogas conversion to biomethane for injection to the gas grid
-
26/02166/FUL Granted
85 Hoole Road Chester CH2 3NJ
Erection of outbuilding and garden wall with gate
-
26/00072/FUL Granted
Land At Sandiway Lane Antrobus Northwich
Side extension to existing agricultural barn/workshop.