Skip to content
PlanIndex Get alerts
Menu

Planning application

14 Clover Birches Ellesmere Port Cheshire CH65 3BY

Granted Cheshire West and Chester 20/02034/FUL Full applications

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension.

As published by the council, reference 20/02034/FUL

Application record

Reference
20/02034/FUL
Category
Full applications
Status
Approved
Decision
Approval
Received
15 Jun 2020
Validated
15 Jun 2020
Decided
27 Jul 2020
Ward
Westminster
Decision by
Delegated Decision
Postcode
CH65 3BY

Timeline

Dates from the published record

  1. 15 Jun 2020

    Received by Cheshire West and Chester

  2. 27 Jul 2020

    Decision issued: Approval

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20 Clover Birches Ellesmere Port Cheshire CH65 3BY

    20/00785/FUL Submitted 2 Mar 2020 30m away

    Single storey side extension and two storey rear extension

    Granted Full applications Extension 10 docs
    Small domestic
  • 66 Jacks Wood Avenue Ellesmere Port Cheshire CH65 3BT

    20/04046/TPO Submitted 30 Oct 2020 51m away

    1x - Q. robur, Pedunculate oak (Tag number - 05399) - Crown lift 3m/reduce from building to give 1m clearance.

    Granted Trees 5 docs
  • Land At Jacks Wood Avenue Ellesmere Port

    22/03504/FUL Submitted 14 Sep 2022 156m away

    New pedestrian footpath to link into existing pedestrian footpath along western side of Jacks Wood Avenue and associated works.

    Granted Full applications 8 docs
  • Land At Rossfield Park and Jacks Wood Jacks Wood Avenue Ellesmere Port Cheshire

    20/03599/FUL Submitted 1 Oct 2020 171m away

    Residential development, including provision of temporary sales area, and provision of formal and informal open space and associated works including highways and drainage works, pedestrian/cycle level rail crossing to Percival Road, enhancement works within Jacks Wood, together with improvements to footbridge approach on Ross Road following demolition of existing building

    Granted Full applications New dwelling Demolition 191 docs
  • Land At Rossbank Road Ellesmere Port Cheshire

    20/01124/REM Submitted 20 Mar 2020 172m away

    Reserved matters application following outline permission 10/00636/OUT (Residential development of up to 190 dwellings with access and associated works) (Phase 5 B Rossfield Park)

    Granted Outline New dwelling 199 docs
    Major scheme
  • Land At Rossbank Road Ellesmere Port Cheshire

    20/00728/NMA Submitted 25 Feb 2020 190m away

    Non-material amendment to conditions 4 (reserved matters), 5 (approved plans), 7 (surface water), 8 (levels), 9 (access), 11 (landscaped acoustic buffer), 12 (recreational open space) and 17 (scheme to protect adjacent housing) on outline permission 10/00636/OUT (Residential Development of up to 190 Dwellings with Access and Associated Works)

    Granted Conditions New dwelling 13 docs
    Major scheme

In Cheshire West and Chester

  • 26/02662/FUL Awaiting decision

    2 Upton Park Upton Chester CH2 1DG

    Alterations to existing extension, including replacement of render with brickwork and roof alterations

    24 Aug 2026 Full applications
  • 26/02656/FUL Awaiting decision

    13 Ince Drive Farndon Chester CH3 6NS

    Erection of porch to front

    21 Aug 2026 Full applications
  • 26/02643/FUL Awaiting decision

    21 York Drive Mickle Trafford Chester CH2 4DT

    Single storey front and rear extensions

    20 Aug 2026 Full applications
  • 26/02636/FUL Awaiting decision

    Southmead Mill Lane Willaston Neston CH64 1RL

    Detached garage

    20 Aug 2026 Full applications
  • 26/02638/FUL Awaiting decision

    107 Pooltown Road Whitby Ellesmere Port CH65 7AF

    Change of use of dwelling to children's home for 2 children

    20 Aug 2026 Full applications