Planning application
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Illuminated signage to Accident and Emergency Department
As published by the council, reference 20/01454/ADV
Application record
- Reference
- 20/01454/ADV
- Type
- Advertising
- Status
- Approved
- Decision
- Approval
- Received
- 24 Apr 2020
- Validated
- 24 Apr 2020
- Decided
- 29 Apr 2020
- Ward
- Upton
- Parish
- Bache
- Decision by
- Delegated Decision
- Postcode
- CH2 1UL
Timeline
Dates from the published record
-
24 Apr 2020
Received by Cheshire West and Chester
-
29 Apr 2020
Decision issued: Approval
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About advertising applications
How this application type works
Advertisement consent controls signs, hoardings and other adverts. The council may only judge two things: amenity, meaning the effect on the appearance of the building and area, and public safety, chiefly whether a sign distracts road users or obstructs sight lines. Other planning considerations, such as competition between businesses, do not apply.
Nearby applications
Within 500 metres
-
The Countess Of Chester Health Park, The Countess Of Chester Hospital Liverpool Road Upton Chester Cheshire West And Chester CH2 1UL
Non Material Amendment to 21/00423/FUL (changes to external appearance and layout)
Granted Amendments 10 docs -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
83% historically approved · decision due ~18 Feb
Variation of Condition 2 (Plans) and 5 (Drainage) of 18/03540/FUL
Awaiting decision Amendments 7 docs -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
Discharge of condition 3 (materials) on planning permission 18/03540/FUL
Granted Conditions 2 docs -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
Amendment to planning permission 18/03540/FUL for alterations to elevations and internal layout
Granted Amendments 10 docs -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
92% historically approved · decision due ~22 Jan
Illuminated and non illuminated signange to include 2 totem signs and entrance sign
Decided Advertising -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
92% historically approved · decision due ~23 Oct
Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure. The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities. In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital. 1. New Energy Generation Compound Construction of a new Energy Generation Compound housing: ? 2 No. 5MW high efficiency gas-fired LTHW boilers ? 1 No. 11m high chimney and associated flue arrangements ? Pressurisation systems ? Expansion plant ? Water treatment equipment ? Associated mechanical services ? Building management systems ? Electrical infrastructure 2. Distribution Infrastructure Construction of: ? New primary LTHW distribution network ? Interconnecting pipework systems 3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems) ? Creche ? Longhouse ? Martindale House ? Moston Lodge ? EDTC & Postgraduate 4. Substation Construction of a new Substation housing: ? Transformer ? LV Switchboard
Awaiting decision Full applications
Other advertising applications
In Cheshire West and Chester
-
26/01626/ADV Granted
4 Civic Way Ellesmere Port CH65 0BE
4 Free-standing Aluminium Signs mounted on 1.5m tall aluminium poles
-
26/01746/ADV Granted
The Bears Paw Hotel 127 Main Street Frodsham WA6 7AF
Illuminated and Non Illuminated signage and replacement cafe barriers.
-
26/01747/LBC Granted
The Bears Paw Hotel 127 Main Street Frodsham WA6 7AF
Installation of replacement signage and 3 no. replacement flood lights.
-
26/00814/ADV Granted
Hartford Methodist Church Beach Road Hartford Northwich CW8 3AB
Non illuminated signage at front of church for noticeboard
-
26/00180/ADV Refused
Winnington Business Park Wolsten Croft Northwich
Retention of two existing, non-illuminated freestanding pole-mounted advertisement signs associated with Cuboid Self Storage. The advertisements comprise static printed panels displaying the company name and branding. (Retrospective).