Skip to content
PlanIndex Get alerts
Menu

Planning application

20 Fieldway Chester Cheshire CH2 3QR

Granted Cheshire West and Chester 20/00790/FUL Full applications

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of rear conservatory and erection of single storey rear extension

As published by the council, reference 20/00790/FUL

Application record

Reference
20/00790/FUL
Category
Full applications
Status
Approved
Decision
Approval
Received
2 Mar 2020
Validated
12 Mar 2020
Decided
6 Apr 2020
Ward
Newton and Hoole
Decision by
Delegated Decision
Postcode
CH2 3QR

Timeline

Dates from the published record

  1. 2 Mar 2020

    Received by Cheshire West and Chester

  2. 12 Mar 2020

    Validated

    Checked as complete and ready for consideration.

  3. 6 Apr 2020

    Decision issued: Approval

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20 Fieldway Chester Cheshire CH2 3QR

    20/00372/LDC Submitted 31 Jan 2020 0m away

    Demolition of existing conservatory and extension to existing lean-to extension to rear

    Withdrawn Lawful development Extension Demolition 3 docs
  • 30 Fieldway Chester Cheshire CH2 3QR

    20/01388/FUL Submitted 20 Apr 2020 66m away

    Alterations to roof and addition of dormer to rear for loft conversion and erection of single storey extensions to side & rear

    Granted Full applications Extension Loft or dormer 8 docs
    Small domestic
  • 84 Woodlands Drive Chester CH2 3QL

    19/01780/FUL Submitted 8 May 2019 67m away

    Demolition of existing outbuilding, erection of single storey rear extension, two storey side extension and attached garage

    Granted Full applications Extension Demolition 17 docs
    Small domestic
  • 1 Fieldway Chester Cheshire CH2 3QR

    20/01873/HHE Submitted 2 Jun 2020 69m away

    Single storey rear extension. Demolition of existing conservatory.

    Granted Other Extension Demolition 6 docs
    Small domestic
  • 125 Woodlands Drive Chester CH2 3QJ

    19/03166/LDC Submitted 19 Aug 2019 70m away

    Addition of outbuilding to garden

    Granted Lawful development 4 docs
  • 125 Woodlands Drive Chester CH2 3QJ

    19/01617/FUL Submitted 26 Apr 2019 70m away

    Proposed garden fence

    Withdrawn Full applications 3 docs
    Small domestic

In Cheshire West and Chester

  • 26/02799/FUL Awaiting decision

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    Drilling of boreholes and installation of covers for groundwater monitoring purposes.

    3 Sep 2026 Full applications
  • 26/01813/FUL Granted

    25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD

    Two storey side extension with single storey front porch extension

    15 Jun 2026 Full applications
  • 26/01781/FUL Granted

    Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    11 Jun 2026 Full applications
  • 26/01635/FUL Granted

    26 Arrowcroft Road Guilden Sutton Chester CH3 7ES

    Single storey rear/side extension

    28 May 2026 Full applications
  • 26/01833/FUL Granted

    6 Oaklands Crescent Tattenhall Chester CH3 9QT

    Two storey side extensions above existing garage and single storey rear extension and render to all walls.

    16 Jun 2026 Full applications