Skip to content
PlanIndex Get alerts
Menu

Planning application

28 Demage Lane Upton Chester Cheshire CH2 1EL

Granted Cheshire West and Chester 20/00143/FUL Full applications

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to side and part single storey, part two storey extension to rear

As published by the council, reference 20/00143/FUL

Application record

Reference
20/00143/FUL
Category
Full applications
Status
Approved
Decision
Approval
Received
15 Jan 2020
Validated
16 Apr 2020
Decided
29 Jul 2020
Ward
Upton
Parish
Upton By Chester
Decision by
Delegated Decision
Postcode
CH2 1EL

Timeline

Dates from the published record

  1. 15 Jan 2020

    Received by Cheshire West and Chester

  2. 16 Apr 2020

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2020

    Decision issued: Approval

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Harby 19 Demage Lane Upton Chester CH2 1EL

    26/00683/FUL Submitted 3 Mar 2026 126m away

    92% historically approved · decision due ~15 May

    Removal of existing conservatory and lobby . First floor dormer to front elevation, and first floor side extension, alteration and replacement of windows and doors. Replacement of flat roof with a pitched roof to garage.

    Awaiting decision Full applications Extension Loft or dormer +1
  • 14 Demage Lane Upton Chester CH2 1EL

    26/00361/FUL Submitted 3 Feb 2026 126m away

    92% historically approved · decision due ~20 Apr

    Alterations to existing front garden to change to driveway to include dropped kerb and electric vehicle charging point

    Decided Full applications
  • 35 Meadowsway Upton Chester CH2 1HZ

    26/00276/FUL Submitted 27 Jan 2026 138m away

    92% historically approved · decision due ~24 Mar

    Demolition of existing outrigger and garage, and erection of two storey side and rear extension with single storey rear infill extension.

    Decided Full applications Extension Demolition
    Small domestic
  • 35 Meadowsway Upton Chester Cheshire CH2 1HZ

    26/00715/HHE Submitted 5 Mar 2026 138m away

    92% historically approved · decision due ~30 Apr

    Single storey rear flat roof extension

    Decided Extension
    Small domestic
  • 43 Meadowsway Upton Chester CH2 1HZ

    25/02373/FUL Submitted 31 Jul 2025 138m away

    92% historically approved · decision due ~10 Nov

    Demolition of existing single storey rear extension, erection of single storey side and rear extension and rear dormer.

    Decided Full applications Extension Loft or dormer +1
    Small domestic
  • Upton Heath Church of England Primary School Upton Lane Upton Chester CH2 1ED

    19/03676/DIS Submitted 4 Oct 2019 164m away

    Discharge of conditions 8 (vehicle charging), 14 (Pitch Ground Conditions), 15 (community use agreement) 17 (Travel Plan) and 24 (Land Contamination) of application 18/03140/FUL

    Granted Conditions 23 docs

In Cheshire West and Chester

  • 26/02799/FUL Awaiting decision

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    Drilling of boreholes and installation of covers for groundwater monitoring purposes.

    3 Sep 2026 Full applications
  • 26/01813/FUL Granted

    25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD

    Two storey side extension with single storey front porch extension

    15 Jun 2026 Full applications
  • 26/01781/FUL Granted

    Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    11 Jun 2026 Full applications
  • 26/01635/FUL Granted

    26 Arrowcroft Road Guilden Sutton Chester CH3 7ES

    Single storey rear/side extension

    28 May 2026 Full applications
  • 26/01833/FUL Granted

    6 Oaklands Crescent Tattenhall Chester CH3 9QT

    Two storey side extensions above existing garage and single storey rear extension and render to all walls.

    16 Jun 2026 Full applications