Skip to content
PlanIndex Get alerts
Menu

Planning application

Innospec Manufacturing Park Oil Sites Road Ellesmere Port CH65 4EY

Granted Cheshire West and Chester 19/03933/DEM Demolition Determination

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of Tel 3 building

As published by the council, reference 19/03933/DEM

Application record

Reference
19/03933/DEM
Type
Demolition Determination
Status
Decided
Decision
Prior Approval required and approved
Received
25 Oct 2019
Validated
20 Nov 2019
Decided
16 Dec 2019
Ward
Gowy Rural
Decision by
Delegated Decision
Postcode
CH65 4EY

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 5 applications since 2019: 3 approved, 0 refused.

  • 26/00792/DIS Awaiting decision

    Innospec Manufacturing Park Oil Sites Road Ellesmere Port CH65 4EY

    Discharge of conditions 4 (sustainable drainage system) ,5 (surface water drainage),7 (site access) and 10 (contamination) of 24/03228/FUL

    Submitted 11 Mar 2026 Conditions
  • 26/00546/DIS Awaiting decision

    Innospec Manufacturing Park Oil Sites Road Ellesmere Port CH65 4EY

    Discharge of condition 8 (bike and cycle parking) and condition 16 (HMMP) of permission 24/03228/FUL

    Submitted 18 Feb 2026
  • 20/02269/FUL Granted

    Innospec Manufacturing Park Oil Sites Road Ellesmere Port CH65 4EY

    Construct a concrete bunded tank farm on Innospec's site to house up to twelve storage tanks

    Decided 15 Sep 2020 Full applications
  • 20/01977/DEM Granted

    Innospec Manufacturing Park Oil Sites Road Ellesmere Port CH65 4EY

    Demolition of TEL 1 Wash building (the building consists of three floors housing 5 vessels)

    Decided 3 Jul 2020 Other

Timeline

Dates from the published record

  1. 25 Oct 2019

    Received by Cheshire West and Chester

  2. 20 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 16 Dec 2019

    Decision issued: Prior Approval required and approved

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cheshire West and Chester granted permission on 16 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cheshire West and Chester

  • 26/02247/HHE Granted

    93 Tarvin Road Littleton Chester CH3 7DE

    Demolition of existing rear single storey extension, erection of rear single storey rear extension.

    20 Jul 2026 Other
  • 26/02298/AGR Granted

    Budworth Hill Farm Warrington Road Great Budworth Northwich CW9 6HA

    Agricultural Store

    22 Jul 2026 Other
  • 26/02363/AGR Granted

    Manor Farm Picton Lane Picton Chester CH2 4HE

    Agricultural storage shed

    28 Jul 2026 Other
  • 26/02219/DEM Granted

    Unit 8 Capenhurst Technology Park Capenhurst Lane Capenhurst Chester CH1 6EH

    Demolition of Unit 8

    16 Jul 2026 Other
  • 26/02215/DEM Granted

    Test 1 and 2 Houses Capenhurst Lane Capenhurst Chester

    Demolition of Test Houses 1 and 2

    16 Jul 2026 Other