Area 10B Ince Resource Recovery Park Grinsome Road Ellesmere Port
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Development of a hydrogen production facility and electricity generating plant, comprising of a waste reception and handling building, gasification facility, hydrogen production facility with associated/ ancillary infrastructure which includes access roads, weighbridge, fencing / gates, lighting, surface water drainage, and electricity distribution plant
As published by the council, reference 19/03489/FUL
Application record
- Reference
- 19/03489/FUL
- Type
- Full Application
- Status
- Approved
- Decision
- Approval
- Received
- 18 Sep 2019
- Validated
- 18 Sep 2019
- Decided
- 18 Mar 2020
- Ward
- Gowy Rural
- Parish
- Ince
- Decision by
- Committee Decision
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 2 applications since 2019: 2 approved, 0 refused.
-
20/03936/DIS Granted
Area 10B Ince Resource Recovery Park Grinsome Road Ellesmere Port
Discharge of conditions 13 (Tree protection),14 (soft landscaping),20 (contamination),25 (woodland habitat area) ,26 (walkover survey),27 (water vole mitigation),28 (RAMS - Trees) and 29 (RAMS -Amphibians) on 19/03489/FUL
Timeline
Dates from the published record
-
18 Sep 2019
Received by Cheshire West and Chester
-
18 Mar 2020
Decision issued: Approval
-
23 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
20/03936/DIS Granted
Area 10B Ince Resource Recovery Park Grinsome Road Ellesmere Port
Discharge of conditions 13 (Tree protection),14 (soft landscaping),20 (contamination),25 (woodland habitat area) ,26 (walkover survey),27 (water vole mitigation),28 (RAMS - Trees) and 29 (RAMS -Amphibians) on 19/03489/FUL
Documents
Plans, drawings, consultee responses and the officer's report
52 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 18 March 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Area 10B Ince Resource Recovery Park Grinsome Road Ellesmere Port
Discharge of conditions 13 (Tree protection),14 (soft landscaping),20 (contamination),25 (woodland habitat area) ,26 (walkover survey),27 (water vole mitigation),28 (RAMS - Trees) and 29 (RAMS -Amphibians) on 19/03489/FUL
Granted Trees 16 docs -
Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
Non material amendment to condition 9 on planning permission 14/02277/S73 to amend the allocation of heavy goods vehicles (HGV) movements between development plots at Protos.
Granted Amendments 4 docs -
Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
Non Material Amendment to 14/02277/S73 (Amend the layout of canal berth located along the Manchester Ship Canal)
Granted Amendments 8 docs -
Land Adjacent Area 12 Ince Resource Recovery Park Grinsome Road Ellesmere Port
Erection of a 132KV/33KV/11KV primary substation with associated underground cables and mess buildings
Granted Full applications 38 docs -
Ince Resource Recovery Park Grinsome Road Ellesmere Port Cheshire
Installation of 33kv underground electricity cables
Granted Full applications 23 docs -
Protos Ince Biomass Power Plant Marsh Lane Ince CH2 4NR
92% historically approved · decision due ~17 Jul
Erection and operation of a Carbon Capture Plant to serve the Ince Bio Power facility
Awaiting decision Full applications 138 docs
Other full applications
In Cheshire West and Chester
-
26/02799/FUL Awaiting decision
Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER
Drilling of boreholes and installation of covers for groundwater monitoring purposes.
-
26/01813/FUL Granted
25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD
Two storey side extension with single storey front porch extension
-
26/01781/FUL Granted
Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH
Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.
-
26/01635/FUL Granted
26 Arrowcroft Road Guilden Sutton Chester CH3 7ES
Single storey rear/side extension
-
26/01833/FUL Granted
6 Oaklands Crescent Tattenhall Chester CH3 9QT
Two storey side extensions above existing garage and single storey rear extension and render to all walls.