Planning application
Land and Buildings Rear of Parkfield Millmoor Drive Macefen Malpas Cheshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions 4 (SuDS Scheme), 8 (Bird bat boxes) and 9 (external lighting) on planning permission 19/00889/FUL
As published by the council, reference 19/03199/DIS
Application record
- Reference
- 19/03199/DIS
- Type
- Discharge of Conditions
- Status
- Approved
- Decision
- Approval
- Received
- 20 Aug 2019
- Validated
- 22 Aug 2019
- Decided
- 25 Oct 2019
- Ward
- Malpas
- Parish
- Nomansheath And District
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
20 Aug 2019
Received by Cheshire West and Chester
-
22 Aug 2019
Validated
Checked as complete and ready for consideration.
-
25 Oct 2019
Decision issued: Approval
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 25 October 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land Adj Top House Farm Chester Road Malpas
Non material amendment to 18/01708/REM (17/01320/OUT) (Replacement of existing 3 double doors to 2 bi-folding doors to single storey element, replacement of double doors to window on rear elevation, replacement of brick soldier course above openings to sandstone headers along with brickwork course detailing alterations, replacement of 2 dormer windows to 1 dormer window on front elevation)
Granted Amendments Loft or dormer Windows or glazing 9 docsSmall domestic -
13 Cross O Th Hill Road Nomans Heath Malpas SY14 8DT
Single storey rear extension
Granted Full applications Extension 4 docsSmall domestic
Other condition discharge and variation applications
In Cheshire West and Chester
-
26/01218/DIS Granted
Land Off Rilshaw Lane Winsford
Discharge of conditions 14 (surface water regulation scheme) and 16 (habitat and landscape management plan) of planning appeal decision APP/A0665/A/14/2229269 (14/01266/OUT) (Residential development of up to 215 dwellings, public open space with recreational facilities, site access, associated highways and infrastructure works)
-
26/01838/DIS Granted
Land At Lostock Works Works Lane Northwich Cheshire
Discharge of condition 11 (waste feedstock transportation) of Deemed Planning Permission 12.04.09.04/35C
-
26/00095/FUL Granted
The Grange Warrington Road Mickle Trafford Chester CH2 4EB
Floodplain enhancements to wetland mosaic and coastal flood plain grazing marsh. Improvement of the habitat condition of the site, including creation and improvement of wetland features including ponds, reedbeds and ditches.
-
26/01485/S73 Granted
The Architect 54 Nicholas Street Chester CH1 2NX
Change of use to drinking establishment (Class A4). Partial demolition of building to be replaced by single storey side/rear extension. Alterations and landscaping works, including erection of external shelter and metal fencing - Variation of condition 9 (opening hours) of planning permission 24/01961/S73, granted on appeal (APP/A0665/W/25/3362728), to remove the temporary element of the condition and allow a permanent permission.
-
26/01200/NMA Granted
Golden Grange High Street Clotton Tarporley CW6 0EG
Non Material Amendment to 21/04362/FUL (update relevant plans approved under Condition 3 (Approved Plans), 13 (Details of Proposed Buildings and Structures) and 20 (Deer Security Fencing), in order to regularise a small number of minor design refinements which had arisen during the procurement and installation of the solar farm development The application also seeks a minor alteration to details secured by Condition 14, pertinent to the approved height of the solar panels.)