Skip to content
PlanIndex Get alerts
Menu

Planning application

Totternhoe Manley Road Alvanley Frodsham Cheshire WA6 9DE

Refused Cheshire West and Chester 19/03160/FUL Full Application

Works: New dwelling Extension Demolition Domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Demolition of The Cottage and erection of one new dwelling and extensions to retained dwelling (Amendment planning permission 18/01962/FUL)

As published by the council, reference 19/03160/FUL

Application record

Reference
19/03160/FUL
Type
Full Application
Status
Refused
Decision
Refusal
Received
19 Aug 2019
Validated
13 Sep 2019
Decided
29 Apr 2020
Ward
Sandstone
Parish
Alvanley
Decision by
Delegated Decision
Postcode
WA6 9DE

Timeline

Dates from the published record

  1. 19 Aug 2019

    Received by Cheshire West and Chester

  2. 13 Sep 2019

    Validated

    Checked as complete and ready for consideration.

  3. 29 Apr 2020

    Decision issued: Refusal

  4. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Cheshire West and Chester

  • 26/01813/FUL Granted

    25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD

    Two storey side extension with single storey front porch extension

    15 Jun 2026 Full applications
  • 26/01781/FUL Granted

    Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    11 Jun 2026 Full applications
  • 26/01635/FUL Granted

    26 Arrowcroft Road Guilden Sutton Chester CH3 7ES

    Single storey rear/side extension

    28 May 2026 Full applications
  • 26/01833/FUL Granted

    6 Oaklands Crescent Tattenhall Chester CH3 9QT

    Two storey side extensions above existing garage and single storey rear extension and render to all walls.

    16 Jun 2026 Full applications
  • 26/02168/FUL Granted

    31 Appleton Road Upton Chester CH2 1JH

    Single storey rear extension

    14 Jul 2026 Full applications