Skip to content
PlanIndex Get alerts
Menu

Planning application

39 High Street Tarporley CW6 0DP

Granted Cheshire West and Chester 19/02447/FUL Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of rear toilet and conservatory and erection of replacement single storey rear extension

As published by the council, reference 19/02447/FUL

Application record

Reference
19/02447/FUL
Type
Full Application
Status
Approved
Decision
Approval
Received
1 Jul 2019
Validated
1 Jul 2019
Decided
5 Sep 2019
Ward
Tarporley
Parish
Tarporley
Decision by
Delegated Decision
Postcode
CW6 0DP

Timeline

Dates from the published record

  1. 1 Jul 2019

    Received by Cheshire West and Chester

  2. 5 Sep 2019

    Decision issued: Approval

  3. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land Opposite 31 High Street Tarporley Cheshire CW6 0DZ

    15/02163/DSM Submitted 21 May 2015 28m away

    DSLAM Cabinet (6LEKJ PCP 1 Re shell PCP cabinet)

    Withdrawn Telecoms 1 doc
  • 1 Millfield Lane Tarporley Cheshire CW6 0BF

    20/04268/CAT Submitted 13 Nov 2020 35m away

    2 x Cypress - Fell. 1 x Bay - Remove 3 x branches as marked on photo.

    Decided 3 docs
  • 1 South Close Tarporley CW6 0DP

    25/02754/CAT Submitted 3 Sep 2025 36m away

    92% historically approved · decision due ~29 Oct

    Reduce 3x large Cypress trees down in height between 15-25ft where appropriate, whilst maintaining as natural shape as possible.

    Decided Trees
  • 30A High Street Tarporley CW6 0DX

    26/01312/S73 Submitted 29 Apr 2026 40m away

    95% historically approved · decision due ~4 Aug

    Variation of condition 2 (approved plans) of planning permission 18/03966/FUL (Change of use of former bank to 2 dwellings, single and three-storey extensions and detached garage to the rear).

    Awaiting decision Conditions Extension 6 docs
    Several homes
  • 30 Millfield Lane Tarporley Cheshire CW6 0BF

    20/00626/CAT Submitted 18 Feb 2020 50m away

    Complete removal of outgrown Beech tree in front garden and replant a young Beech or Acer in its place.

    Decided Heritage and listed buildings Trees 3 docs
  • 53 High Street Tarporley CW6 0DP

    25/03803/FUL Submitted 4 Dec 2025 66m away

    92% historically approved · decision due ~16 Feb

    New shop front and replacement of refrigeration plant to the rear.

    Awaiting decision Full applications Windows or glazing 6 docs

In Cheshire West and Chester

  • 26/02799/FUL Awaiting decision

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    Drilling of boreholes and installation of covers for groundwater monitoring purposes.

    3 Sep 2026 Full applications
  • 26/01813/FUL Granted

    25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD

    Two storey side extension with single storey front porch extension

    15 Jun 2026 Full applications
  • 26/01781/FUL Granted

    Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    11 Jun 2026 Full applications
  • 26/01635/FUL Granted

    26 Arrowcroft Road Guilden Sutton Chester CH3 7ES

    Single storey rear/side extension

    28 May 2026 Full applications
  • 26/01833/FUL Granted

    6 Oaklands Crescent Tattenhall Chester CH3 9QT

    Two storey side extensions above existing garage and single storey rear extension and render to all walls.

    16 Jun 2026 Full applications