Green Trees King Street Byley Northwich Cheshire CW10 9LD
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Change of Use from Poultry Sheds to General Industrial (Class B2)
As published by the council, reference 19/01983/FUL
Application record
- Reference
- 19/01983/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Withdrawn
- Received
- 22 May 2019
- Validated
- 22 May 2019
- Decided
- 3 Sep 2020
- Ward
- Shakerley
- Parish
- Byley
- Decision by
- Delegated Decision
- Postcode
- CW10 9LD
Timeline
Dates from the published record
-
22 May 2019
Received by Cheshire West and Chester
-
3 Sep 2020
Decision issued: Withdrawn
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Cheshire West and Chester decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 27 (proposed route access) on planning permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development) for Phase One Area
Granted Conditions 11 docs -
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of conditions 8 (landscaping), 9 (nesting birds), 13 (wildlife protection plan), 14 (bat survey), 16 (walkover survey), 17 (large mammal survey), 19 (management/control of Japanese Knotweed and Himalayan Balsam), 20 (construction environmental plan), 21 (trees and hedgerows to be removed), 22 (arboricultural method statement), 23 (ecological mitigation measures), 25 (method statement), 28 (HGV routing list), 30 (programme of archaeological work), 31 (contamination of surface waters), 33 (lighting), 34 (noise and vibrations), 36 (remediation strategy), 41 (restoration works) and 42 (restoration aftercare) in relation to phase one.
Granted Conditions Trees 38 docs
Other full applications
In Cheshire West and Chester
-
25/01159/FUL Granted
Land At Canaan Farm Bell O The Hill Road Tushingham Cum Grindley Malpas SY13 4QR
Demolition of existing dwelling and the erection of a new dwelling
-
25/03900/FUL Granted
Garden Lane Medical Centre 17 and 19 Garden Lane Chester CH1 4EN
Side extension to No.19 and Removal of shared canopy. Alterations to windows and doors for both No 17 and 19, including replacement of all windows of No.19
-
26/01251/FUL Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Extension of the Northwich Biogas Facility Anaerobic Digestion plant including new infrastructure for biogas conversion to biomethane for injection to the gas grid
-
26/02166/FUL Granted
85 Hoole Road Chester CH2 3NJ
Erection of outbuilding and garden wall with gate
-
26/00072/FUL Granted
Land At Sandiway Lane Antrobus Northwich
Side extension to existing agricultural barn/workshop.