Planning application
7 Ash Grove Chester Cheshire CH4 7QN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Reduce by half one Yew
As published by the council, reference 08/01408/CAT
Application record
- Reference
- 08/01408/CAT
- Type
- Application to fell/lop in Cons Area
- Status
- Permitted
- Decision
- Permitted
- Received
- 17 Jul 2008
- Decided
- 4 Aug 2008
- Ward
- Curzon And Westminster
- Decision by
- Delegated Decision
- Postcode
- CH4 7QN
Timeline
Dates from the published record
-
17 Jul 2008
Received by Cheshire West and Chester
-
4 Aug 2008
Decision issued: Permitted
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 4 August 2008, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
2 Cottage Road Chester CH4 7QB
92% historically approved · decision due ~6 Jul
Construction of a single-storey rear extension
Decided Lawful development ExtensionSmall domestic -
107 Five Ashes Road Chester Cheshire CH4 7QA
Single storey rear extension and dormer to rear
Granted Full applications Extension Loft or dormer 9 docsSmall domestic -
Meadow House Wrexham Road Chester
Discharge of condition 8 (materials) of planning permission 20/00998/FUL (Demolition of existing dwelling and erection of replacement dwelling)
Granted Conditions Demolition 3 docsDomestic -
Meadow House Wrexham Road Chester CH4 7QQ
Demolition of existing dwelling and erection of replacement dwelling
Granted Full applications Demolition 60 docsDomestic -
Land Adjacent Meadow House Wrexham Road Chester
Discharge of condition 22 (Verification Report) on 18/00932/FUL (Erection of three detached dwellings together with associated access, parking and landscaping)
Granted Conditions 3 docs -
Land Adjacent To Meadow House Wrexham Road Chester
Discharge of condition 10 (materials) on planning permission 18/00932/FUL (Erection of three dwellings)
Granted Conditions 4 docsSeveral homes
Other heritage and listed building applications
In Cheshire West and Chester
-
26/01666/LBC Granted
The Old Vicarage Whitegate Lane Winsford CW8 2AZ
Conversion of part of attic to a dressing room with associated storeroom including installation of a new timber access staircase and new attic floor, beams and floor joists to be installed above the existing retained first floor ceiling.
-
26/01749/LBC Granted
The Bears Paw Hotel 127 Main Street Frodsham WA6 7AF
Internal and external works of repair, redecoration and refurbishment of listed building, including external alterations comprising infilling of east elevation at ground floor to form accessible WC and new gates to store, minor works of repair and refurbishment to 'The Barn' and repairs to garden walls and new balustrade.
-
26/02393/NMA Granted
Land At Protos (Ince Resource Recovery Park) Grinsome Road and Marsh Lane Ince
Non-material amendment to planning permission 24/00261/FUL - Amendment to the approved drawings listed at condition 2.
-
26/02798/LBC Awaiting decision
Holiday Inn Lower Mersey Street Ellesmere Port CH65 2AL
Replacement windows. Replacement roof to main hotel and middle appex of the leisure centre.
-
26/00961/LBC Granted
Little Sutton Station Station Road Little Sutton Ellesmere Port CH66 1NT
Refurbishment and improvement works to the footbridge and staircase that connects Platform 1 and 2