Planning application
8 Hopcroft Avenue Ambrosden OX25 2DB
Works: New dwelling Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Plot 376 Graven Hill - Detached 4 bed dwelling (self build) and single storey outbuilding
As published by the council, reference 25/03112/F
Application record
- Reference
- 25/03112/F
- Type
- Full Development
- Status
- Application Permitted
- Decision
- Permitted
- Received
- 1 Dec 2025
- Validated
- 4 Dec 2025
- Decided
- 18 Jun 2026
- Ward
- Bicester South And Ambrosden
- Parish
- Bicester
- Decision by
- Delegated
- Postcode
- OX25 2DB
Timeline
Dates from the published record
-
1 Dec 2025
Received by Cherwell
-
4 Dec 2025
Validated
Checked as complete and ready for consideration.
-
18 Jun 2026
Decision issued: Permitted
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
16 Hopcroft Avenue Ambrosden Bicester OX25 2DB
Reserved Matters Application - New 3 bedroom dwelling - Plot 380 Rural Lane
Granted Outline 14 docsDomestic -
18 Hopcroft Avenue Ambrosden Bicester OX25 2DB
Reserved Matters Application - New 5 bedroom dwelling - Plot 381 Rural Lane
Granted Outline 14 docsDomestic -
14 Hopcroft Avenue Graven Hill - Plot 379 Ambrosden Bicester OX25 2DB
Reserved Matters application - new 3 bedroom dwelling - plot 379 Rural Lane
Granted Outline 14 docsDomestic -
5-19 Austin Way Ambrosden Bicester OX25 2DA
Change in brick to Hampton rural blend, which is a similar looking brick and has also been approved for use elsewhere on the site. Change in levels to plot 367. (proposed as non-material amendment to 20/01397/REM)
Granted Amendments 4 docs -
5 Cherry Walk Ambrosden Bicester OX25 2BZ
Detached 3-bedroom house - Plot 322 (Community Street)
Decided 4 docs -
Other full applications applications
In Cherwell
-
26/01677/F Granted
26 Whimbrel Way Banbury OX16 9YX
Single storey rear extension and conversion of garage to habitable accommodation
-
26/00945/F Granted
Warren Lodge Middle Aston Lane Middle Aston OX25 5QA
One and a half storey extension to existing dwelling
-
26/01678/F Granted
Tally Ho View Banbury Road North Newington OX15 6AB
Replacement of timber windows with aluminium windows
-
26/01533/F Granted
Vine Cottage Bonds End Lane Sibford Gower OX15 5RT
Garden room extension
-
26/01465/F Granted
Vine Cottage School Lane Wigginton OX15 4JX
Extensions and alterations to existing outbuilding on western boundary of the site and demolition of outbuilding in centre of garden space