Planning application
6 Canterbury Close Banbury OX16 4FF
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
First floor side, single storey rear extension with associated internal and external works
As published by the council, reference 25/03010/F
Application record
- Reference
- 25/03010/F
- Type
- Full Development
- Status
- Application Permitted
- Decision
- Permitted
- Received
- 18 Nov 2025
- Validated
- 20 Nov 2025
- Decided
- 20 Dec 2025
- Ward
- Banbury Grimsbury And Hightown
- Parish
- Banbury
- Decision by
- Delegated
- Postcode
- OX16 4FF
Timeline
Dates from the published record
-
18 Nov 2025
Received by Cherwell
-
20 Nov 2025
Validated
Checked as complete and ready for consideration.
-
20 Dec 2025
Decision issued: Permitted
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Lochinvar 8 Lombard Way Banbury OX16 4TJ
Prune Oak (T1) located at the back of Unit 8 - Prune back all branches to allow a 3 metre clearance back from the building - subject to TPO 21/1996
Granted Trees 6 docs -
13 Priory Vale Road Banbury OX16 4FR
Extension of the existing dropped kerb from 1.2m to 4.5m serving the property to provide a vehicular access to the front of the property
Granted Full applications Extension 8 docs -
Best Food Logistics Dorcas Road Banbury Oxfordshire OX16 4XJ
Extension of Plant Platform in Goods-in yard
Granted Full applications Extension 11 docs -
Street Record Overthorpe Road Banbury Ox16 4XJ
Installation of 1 x 12m light wooden pole
Decided Telecoms 1 doc -
Middleton Road Banbury OX16 4RS
Replacement of 3 No MHAs within GRP shroud. Installation of 6 No combiners and 2 No RRHs within the existing cabinet. Installation of ancillary equipment, draw pit and steelwork.
Decided Telecoms 2 docs -
Unit 4 Middleton Close Banbury OX16 4RS
145.6 kWp System comprising 320 PV modules on south pitched roof
Granted 15 docs
Other full applications applications
In Cherwell
-
26/01677/F Granted
26 Whimbrel Way Banbury OX16 9YX
Single storey rear extension and conversion of garage to habitable accommodation
-
26/00945/F Granted
Warren Lodge Middle Aston Lane Middle Aston OX25 5QA
One and a half storey extension to existing dwelling
-
26/01678/F Granted
Tally Ho View Banbury Road North Newington OX15 6AB
Replacement of timber windows with aluminium windows
-
26/01533/F Granted
Vine Cottage Bonds End Lane Sibford Gower OX15 5RT
Garden room extension
-
26/01465/F Granted
Vine Cottage School Lane Wigginton OX15 4JX
Extensions and alterations to existing outbuilding on western boundary of the site and demolition of outbuilding in centre of garden space