Skip to content
PlanIndex Get alerts
Menu

Planning application

West Wind Scotland End Hook Norton Oxfordshire OX15 5NR

Granted Cherwell 25/02834/F Full Development

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing conservatory and erection of single storey rear extension to create kitchen/diner. Erection of 1.5 storey extension to integrate garage into dwelling and en-suite bathroom at first floor

As published by the council, reference 25/02834/F

Application record

Reference
25/02834/F
Type
Full Development
Status
Application Permitted
Decision
Permitted
Received
28 Oct 2025
Validated
3 Nov 2025
Decided
31 Dec 2025
Ward
Deddington
Parish
Hook Norton
Decision by
Delegated
Postcode
OX15 5NR

Timeline

Dates from the published record

  1. 28 Oct 2025

    Received by Cherwell

  2. 3 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 31 Dec 2025

    Decision issued: Permitted

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Dove Close House The Bourne Hook Norton OX15 5NR

    25/00122/TCA_5 Submitted 15 Jan 2025 0m away

    97% historically approved · decision due ~12 Mar

    T1-T2 Fell. The larger tree has hornet moth larvae damage around the base and around the wound left by previous branch separation. The smaller tree has uprooted and is leaning against the bigger tree

    Awaiting decision Trees 3 docs
  • Dove Close House The Bourne Hook Norton OX15 5NR

    24/03291/TCA Submitted 9 Dec 2024 0m away

    97% historically approved · decision due ~3 Feb

    1 x Small Poplar 15m high has failed at the base of the tree and is resting on the larger 25m Poplar next to it. The small Poplar needs removing completely as the base of the trunk has failed. It it falls away from its current supporting branches, it will fall onto the BT line of the neighbouring property. The larger Poplar needs removing or pollarding right down to the first split as there is evidence of hornet moth activity at the base, and water ingress following previous damage. We have had quotes from 2 arboriculture companies, who have both recommended removal of both trees. We have other sapling trees currently growing in pots (cotoneaster and holly) which we would plant to replace these trees. The location of the trees is marked by red dots on the accompanying information.

    Awaiting decision Trees 6 docs
  • 4 Brookside Hook Norton OX15 5NS

    26/00599/TCA Submitted 6 Mar 2026 47m away

    T1 Oak - Remove major deadwood, crown lift to 5 metres roadside to clear highway. T2 - Common Horse chestnut - Crown raise to 4 metres garden side, reduce garden side by 1 metre.

    Granted Trees 12 docs
  • Finches 1 Brookside Hook Norton OX15 5NS

    24/02459/TCA Submitted 12 Sep 2024 47m away

    T1 x Red Oak - Fell because of closeness to overhead power cables, shading and low amenity value.

    Granted Trees 4 docs
  • Pear Tree Cottage Scotland End Hook Norton OX15 5NU

    25/02377/TCA Submitted 13 Sep 2025 83m away

    T1 Ornamental cherry - lift and thin crown and reduce by 2.5 Metres

    Granted Trees 8 docs
  • Brooklyn Farm Chipping Norton Road Hook Norton Banbury OX15 5NT

    22/03531/DISC Submitted 23 Nov 2022 131m away

    Discharge of Condition 9 (landscaping scheme) and 11 (surface water drainage) of 22/01650/F

    Granted Conditions

In Cherwell

  • 26/01677/F Granted

    26 Whimbrel Way Banbury OX16 9YX

    Single storey rear extension and conversion of garage to habitable accommodation

    30 Jun 2026 Full applications
  • 26/00945/F Granted

    Warren Lodge Middle Aston Lane Middle Aston OX25 5QA

    One and a half storey extension to existing dwelling

    15 Apr 2026 Full applications
  • 26/01678/F Granted

    Tally Ho View Banbury Road North Newington OX15 6AB

    Replacement of timber windows with aluminium windows

    15 Jun 2026 Full applications
  • 26/01533/F Granted

    Vine Cottage Bonds End Lane Sibford Gower OX15 5RT

    Garden room extension

    15 Jun 2026 Full applications
  • 26/01465/F Granted

    Vine Cottage School Lane Wigginton OX15 4JX

    Extensions and alterations to existing outbuilding on western boundary of the site and demolition of outbuilding in centre of garden space

    10 Jun 2026 Full applications