Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Greenside Cottages Somerton Road North Aston Oxfordshire OX25 6HU

Granted Cherwell 25/02156/LB Listed Building

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement windows, two on the first floor side elevation and one to the rear (covering revisions to Listed Building Consent reference 23/03027/LB)

As published by the council, reference 25/02156/LB

Application record

Reference
25/02156/LB
Type
Listed Building
Status
Application Permitted
Decision
Granted As published: Permitted
Received
19 Aug 2025
Validated
1 Sep 2025
Decided
27 Oct 2025
Ward
Deddington
Parish
North Aston
Decision by
Delegated
Postcode
OX25 6HU

Site history

Applications at this address on the Cherwell register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 24/01089/DISC Granted

    3 Greenside Cottages Somerton Road North Aston Oxfordshire OX25 6HU

    Discharge of Condition 3 (rethatching) and Condition 6 (external materials) of 23/03026/F

    Decided 20 Jan 2025 Conditions
  • 24/01090/DISC Granted

    3 Greenside Cottages Somerton Road North Aston Oxfordshire OX25 6HU

    Discharge of Condition 3 (rethatching) and Condition 6 (external materials) of 23/03027/LB

    Decided 20 Jan 2025 Conditions

Timeline

Dates from the published record

  1. 19 Aug 2025

    Received by Cherwell

  2. 1 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 27 Oct 2025

    Decision issued: Permitted

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cherwell granted permission on 27 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Cherwell

  • 26/01741/LB Granted

    The Red Lion High Street Islip OX5 2RX

    Demolition of existing modern extensions. New single storey link extension. Internal and external alterations to the building and associated works to facilitate revised layout and provision of guest accommodation alongside manager's flat

    Received 6 Jul, published by the council 1 Aug 2026 Heritage and listed buildings
  • 26/02632/LB Awaiting decision

    Gage Farm Sibford Road Epwell Oxfordshire OX15 6LH

    Replacement boot room windows and formation of a first floor en-suite and cupboard, with associated drainage and roof vents

    Received 7 Oct, published by the council 9 Oct 2026 Heritage and listed buildings
  • 26/02004/LB Granted

    The Motor Shed Building 135 Bicester Motion Heritage Buckingham Road Bicester OX27 8AL

    Internal and external alterations

    Received 31 Jul, published by the council 2 Sep 2026 Heritage and listed buildings
  • 26/01434/LB Granted

    21 Crouch Street Banbury OX16 9PP

    Minor external repairs and redecoration. Minor masonry repairs to damaged areas of existing plaster. Sanding down and redecoration of all external woodwork. Repainting elevation of all external woodwork. Repainting external elevations.

    Received 5 Jun, published by the council 1 Aug 2026 Heritage and listed buildings
  • 26/02610/LB Awaiting decision

    The Homestead The Green Barford St Michael Oxfordshire OX15 0RN

    Like-for-like replacement of the conservatory joinery (existing unauthorised)

    Received 5 Oct, published by the council 9 Oct 2026 Heritage and listed buildings