Planning application
Park Gate Park Place Cheltenham Gloucestershire
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
T1. Moutain Ash. Prune back encroaching branches giving 0.5m clearance. T2. Copper Beech. Prune back encroaching and overhanging branches from building, roof and telephone cable, giving 1m clearance. T4. Crab Apple. Crown reduction works, specification to include. A height reduction of 1.5m and spread reduction of 0.5m. cutting back to strong secondary growth, shape and balance, leaving a flowing branch line. Remove basal growth. T7. Cherry. Crown reduction works, specification to include. A height reduction of 0.75m and spread reduction of 0.50m. T9. Greengage. Crown reduction works, specification to include. A height reduction of 2m and spread reduction of 2.5m East side and 1m West side. Prune away from street light to give 0.5m clearance. Crown lift over footway up to 2m. Remove basal growth. cutting back to strong secondary growth, shape and balance, leaving a flowing branch line. T10. Lime. Remove all epicormic growth up to 5m and inspect trifurcated unions from 2m.
As published by the council, reference 26/01574/CACN
Application record
- Reference
- 26/01574/CACN
- Status
- No objection
- Decision
- Granted As published: No objection raised
- Received
- 5 Oct 2026
- Validated
- 6 Oct 2026
- Decided
- 6 Oct 2026
Site history
Applications at this address on the Cheltenham register
This site has had 4 applications since 2019: 4 approved, 0 refused.
-
21/02485/CACN Granted
Park Gate Park Place Cheltenham Gloucestershire
(T1) Lime - reduce crown by 2.5m height and 2m spread, (T2) Damson - reduce crown by 1.5m, (T3) Copper Beech - reduce crown by 2m
-
19/00205/CACN Granted
Park Gate Park Place Cheltenham Gloucestershire
Robinia (Acacia), located in the rear garden - Remove
-
19/00090/CACN Granted
Park Gate Park Place Cheltenham Gloucestershire
Golden Robinia Tree - remove 2X lower limbs and thin canopy by 30%
Timeline
Dates from the published record
-
5 Oct 2026
Received by Cheltenham
-
6 Oct 2026
Validated
Checked as complete and ready for consideration.
-
6 Oct 2026
Decision issued: No objection raised
-
6 Oct 2026
Added to PlanIndex
What this grant of permission means
Cheltenham granted permission on 6 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Cheltenham's portal will say. Our guide explains the common types.