Skip to content
PlanIndex Get alerts
Menu

Planning application

25 Montpellier Terrace Cheltenham Gloucestershire

Awaiting decision Cheltenham 26/01222/LBC Heritage and listed buildings

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

The proposed works comprise the reconfiguration of the property from four one-bedroom flats into a single three-storey maisonette occupying the upper ground, first and second floors, with the existing lower ground floor retained as a self-contained one-bedroom subsidiary dwelling (retrospective).

As published by the council, reference 26/01222/LBC

Application record

Reference
26/01222/LBC
Category
Heritage and listed buildings
Status
Pending Consideration
Received
30 Jul 2026
Validated
17 Aug 2026
Ward
Lansdown
Decision by
Delegated Decision

Comment by 17 September 2026

The council is taking comments on this application until then. Comments go to Cheltenham through their own planning portal.

Site history

Applications at this address on the Cheltenham register

This site has had 2 applications since 2026.

  • 26/01222/FUL Awaiting decision

    25 Montpellier Terrace Cheltenham Gloucestershire

    Reconfiguration of the property from four one-bedroom flats into a single three-storey maisonette and retaining the existing lower ground floor as a self-contained one-bedroom subsidiary dwelling (retrospective)

    Submitted 30 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Cheltenham

  2. 17 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cheltenham took a median of 44 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 26/01222/FUL (Pending Consideration)

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

  • Site notice Site Notice · 27 Aug 2026
  • Revised existing lower ground floor Revised Drawing · 14 Aug 2026
  • Revised existing second floor Revised Drawing · 14 Aug 2026
  • Revised existing first floor Revised Drawing · 14 Aug 2026
  • Revised existing upper ground Revised Drawing · 14 Aug 2026
  • Revised proposed upper ground Revised Drawing · 14 Aug 2026
  • Revised proposed first floor Revised Drawing · 14 Aug 2026
  • Revised proposed second floor Revised Drawing · 14 Aug 2026
  • Revised proposed lower ground Revised Drawing · 14 Aug 2026
  • Existing lower ground floor Superseded Documents · 03 Aug 2026
  • Existing upper ground floor Superseded Documents · 03 Aug 2026
  • Existing first floor Superseded Documents · 03 Aug 2026
  • Existing second floor Superseded Documents · 03 Aug 2026
  • Proposed lower ground floor Superseded Documents · 03 Aug 2026
  • Proposed upper ground floor Superseded Documents · 03 Aug 2026
  • Proposed first floor Superseded Documents · 03 Aug 2026
  • Proposed second floor Superseded Documents · 03 Aug 2026
  • Application form Application Form · 30 Jul 2026
  • Site location plan OS Extract · 30 Jul 2026
  • Design and access statement BackGround Papers · 30 Jul 2026
  • Heritage statement Report · 30 Jul 2026
  • Photographs and photomontages Photo · 30 Jul 2026
  • Existing lower ground floor Superseded Documents · 30 Jul 2026
  • Existing upper ground floor Superseded Documents · 30 Jul 2026
  • Existing first floor plan Superseded Documents · 30 Jul 2026
  • Existing second floor plan Superseded Documents · 30 Jul 2026
  • Proposed lower ground floor plan Superseded Documents · 30 Jul 2026
  • Proposed upper ground floor Superseded Documents · 30 Jul 2026
  • Proposed first floor plan Superseded Documents · 30 Jul 2026
  • Proposed second floor plan Superseded Documents · 30 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cheltenham for determination, against a statutory target of eight weeks. Over the last year Cheltenham decided heritage and listed building applications in a median of 7 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In Cheltenham

  • 26/01418/LBC Awaiting decision

    23 Clarence Square Cheltenham Gloucestershire GL50 4JP

    Proposed single-storey rear extension at lower ground floor level, associated internal alterations and reconfiguration, and associated external works.

    4 Sep 2026 Heritage and listed buildings
  • 26/01409/LBC Awaiting decision

    Scout Headquarters The Burgage Prestbury Cheltenham Gloucestershire GL52 3DN

    Redevelopment of the existing scout hut, demolition of existing brick extension and the construction of a new hall with improved access from The Burgage, installation of PV panels and ASHP.

    2 Sep 2026 Heritage and listed buildings
  • 26/01377/LBC Awaiting decision

    Flat 1 79 Pittville Lawn Cheltenham Gloucestershire GL52 2BP

    Extensions, alterations and conversion of the existing outbuilding/garage into a single 2 bedroom dwelling

    27 Aug 2026 Heritage and listed buildings
  • 26/01372/LBC Awaiting decision

    9 Bath Parade Cheltenham Gloucestershire GL53 7HL

    Proposed rear lower ground floor extension, installation of solar panels, and excavation works to lower part of the existing garden level and create a patio area.

    25 Aug 2026 Heritage and listed buildings
  • 26/00530/LBC Granted

    Cheltenham General Hospital Sandford Road Cheltenham Gloucestershire GL53 7AN

    Extension to the Oncology Department including demolition of the modern structure appended to the end of the East Block and associated infrastructure.

    27 Mar 2026 Heritage and listed buildings