113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

Granted Cheltenham 25/01854/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of the existing property from offices (Use Class E) to residential (Use Class C3), including the remodelling of the existing rear extension.

As published by the council, reference 25/01854/FUL

Application record

Reference
25/01854/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Granted As published: Permit
Received
18 Nov 2025
Validated
2 Dec 2025
Decided
25 Feb 2026
Ward
Park
Decision by
Delegated Decision
Postcode
GL53 7LS

Site history

Applications at this address on the Cheltenham register

This site has had 4 applications since 2023: 3 approved, 0 refused.

  • 25/01854/LBC Granted

    113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

    Conversion of the existing property from offices (Use Class E) to residential (Use Class C3), including the remodelling of the existing rear extension.

    Decided 25 Feb 2026 Heritage and listed buildings
  • 24/00712/FUL Withdrawn

    113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

    Proposed change of use of whole building from office (Class E) to a single residential unit (Class C3)

    Decided 19 Sep 2024 Full applications
  • 23/00140/CACN Granted

    113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

    T1 Sycamore Tree Remove lowest limbs on the right hand side. Reduce limbs going over red brick house by 2-3m, cut back any branches over Pillar house & crown thin by 10-15% T2 Horse Chestnuts X 2 Re-pollard back to old pollard points.

    Decided 17 May 2023 Heritage and listed buildings

Timeline

Dates from the published record

  1. 18 Nov 2025

    Received by Cheltenham

  2. 2 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 25 Feb 2026

    Decision issued: Permit

  4. 27 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 25/01854/LBC (Grant)

Who's behind it

Company information only, from the register and Companies House

KEW Planning Agent, a planning consultancy

56 applications on PlanIndex · across 12 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

BMS Technologies LTD Applicant, registered in Tewkesbury

Active · incorporated 2010 · Tewkesbury

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

65 documents on file for this application

  • Officer report Report · 25 Feb 2026
  • Section 106 unilateral undertaking dated 18.02.2026 BackGround Papers · 18 Feb 2026
  • Power box datasheet BackGround Papers · 12 Jan 2026
  • Arboricultural method statement BackGround Papers · 12 Jan 2026
  • Ecologist response Consultee Comment · 12 Jan 2026
  • Power box datasheet BackGround Papers · 07 Jan 2026
  • Power box manual BackGround Papers · 07 Jan 2026
  • Gcc highways response Consultee Comment · 05 Jan 2026
  • Tree constratints plan Approved Drawing · 19 Dec 2025
  • Tree survey BackGround Papers · 19 Dec 2025
  • Historic england response Consultee Comment · 15 Dec 2025
  • Heritage impact assessment final (1) Report · 12 Dec 2025
  • Additional existing section aa. Approved Drawing · 12 Dec 2025
  • Additional demolition section aa Approved Drawing · 12 Dec 2025
  • Additional proposed section aa Approved Drawing · 12 Dec 2025
  • Additional bike and bin shed all views Drawing · 12 Dec 2025
  • Landscape concept rev b Approved Drawing · 04 Dec 2025
  • Hard landscape proposals Approved Drawing · 04 Dec 2025
  • Detailing trellis panels Approved Drawing · 04 Dec 2025
  • Shade garden sections. Approved Drawing · 04 Dec 2025
  • Soft landscape proposals rev a Approved Drawing · 04 Dec 2025
  • Tree planting details Approved Drawing · 04 Dec 2025
  • Bng baseline pillar house v1 BackGround Papers · 03 Dec 2025
  • Bng proposal pillar house v1 BackGround Papers · 03 Dec 2025
  • Ukhab and statutory biodiversity net gain feasibility assessment BackGround Papers · 03 Dec 2025
  • Biodiversity net gain matrix BackGround Papers · 03 Dec 2025
  • Application form Application Form · 18 Nov 2025
  • Protected species survey Report · 18 Nov 2025
  • Landscaping details Report · 18 Nov 2025
  • Outline energy statement Report · 18 Nov 2025
  • Transport assessment Report · 18 Nov 2025
  • Tree survey Report · 18 Nov 2025
  • Superseded tree constraints plan Superseded Documents · 18 Nov 2025
  • Site location plan Approved Drawing · 18 Nov 2025
  • Design and access statement BackGround Papers · 18 Nov 2025
  • Drawing issue sheet BackGround Papers · 18 Nov 2025
  • Site waste management plan BackGround Papers · 18 Nov 2025
  • Planning statement Report · 18 Nov 2025
  • Covering letter BackGround Papers · 18 Nov 2025
  • Existing site plan Drawing · 18 Nov 2025
  • Existing first floor Drawing · 18 Nov 2025
  • Existing second floor Drawing · 18 Nov 2025
  • Existing roof plan Drawing · 18 Nov 2025
  • Existing basement floor Drawing · 18 Nov 2025
  • Existing block plan Drawing · 18 Nov 2025
  • Existing southeast elevation Drawing · 18 Nov 2025
  • Existing northeast elevation Drawing · 18 Nov 2025
  • Existing northwest elevation Drawing · 18 Nov 2025
  • Existing southwest elevation Drawing · 18 Nov 2025
  • Existing ground floor Drawing · 18 Nov 2025
  • Demolition ground floor plan Approved Drawing · 18 Nov 2025
  • Demolition first floor plan Approved Drawing · 18 Nov 2025
  • Demolition second floor plan Approved Drawing · 18 Nov 2025
  • Demolition basement floor Drawing · 18 Nov 2025
  • Proposed site plan Approved Drawing · 18 Nov 2025
  • Proposed ground floor plan Approved Drawing · 18 Nov 2025
  • Proposed first floor plan Approved Drawing · 18 Nov 2025
  • Proposed second floor plan Approved Drawing · 18 Nov 2025
  • Proposed roof plan Approved Drawing · 18 Nov 2025
  • Proposed basement floor Approved Drawing · 18 Nov 2025
  • Proposed block plan Approved Drawing · 18 Nov 2025
  • Proposed southeast elevation Approved Drawing · 18 Nov 2025
  • Proposed northeast elevation Approved Drawing · 18 Nov 2025
  • Proposed northwest elevation Drawing · 18 Nov 2025
  • Proposed southwest elevation Approved Drawing · 18 Nov 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cheltenham granted permission on 25 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

    25/01854/LBC Submitted 18 Nov 2025 50 yards away

    Conversion of the existing property from offices (Use Class E) to residential (Use Class C3), including the remodelling of the existing rear extension.

    Granted Heritage and listed buildings Extension 57 docs
  • 113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

    24/00712/FUL Submitted 29 Apr 2024 50 yards away

    Proposed change of use of whole building from office (Class E) to a single residential unit (Class C3)

    Withdrawn Full applications 8 docs
  • 113 - 115 Bath Road Cheltenham Gloucestershire GL53 7LS

    23/00140/CACN Submitted 26 Jan 2023 50 yards away

    T1 Sycamore Tree Remove lowest limbs on the right hand side. Reduce limbs going over red brick house by 2-3m, cut back any branches over Pillar house & crown thin by 10-15% T2 Horse Chestnuts X 2 Re-pollard back to old pollard points.

    Granted Heritage and listed buildings Trees 5 docs
  • Hsbc Bank 109 - 111 Bath Road Cheltenham Gloucestershire GL53 7LS

    19/01381/CACN Submitted 10 Jul 2019 50 yards away

    Trees - Pruning as agreed on site with Council Trees Officer (issued in retrospect-pruning now complete)

    Granted Heritage and listed buildings Trees 4 docs
  • Corinth House 117 Bath Road Cheltenham Gloucestershire GL53 7LS

    18/02389/CACN Submitted 22 Nov 2018 50 yards away

    Front Boundary, Holm Oak (T1) - Crown Lift all around up to 6m, road side only. Crown thin the canopy directly above number 117 by 15% . To reduce scaffold branch weight. Lift crown of adjacent roof to give 1.5m clearance. Trim branches away from street lamp giving 2m clearance. Remove all dead, dying and broken branches though out the canopy. Remove epicormic growth up to 7m. Front Entrance, Holm Oak (T2) - Crown lift all around up to 2.3m, secondary branches only.

    Granted Heritage and listed buildings Trees 3 docs
  • Corinth House 117 Bath Road Cheltenham Gloucestershire GL53 7LS

    26/01597/FUL Submitted 7 Oct 2026 50 yards away

    96% historically approved · decision due ~3 Dec

    Installation of 8 no. condenser units, 7 no. acoustic enclosures, an automated security barrier and associated access control infrastructure.

    Awaiting decision Full applications

In Cheltenham

  • 26/01230/FUL Refused

    46 Bath Parade Cheltenham Gloucestershire GL53 7HU

    Proposed annexe over existing garage and link corridor.

    Received 31 Jul, published by the council 20 Aug 2026 Full applications
  • 26/01372/FUL Granted

    9 Bath Parade Cheltenham Gloucestershire GL53 7HL

    Proposed rear lower ground floor extension, installation of solar panels, and excavation works to lower part of the existing garden level and create a patio area.

    Received 25 Aug, published by the council 2 Sep 2026 Full applications
  • 26/01208/FUL Granted

    New Bungalow Merestones Road Cheltenham Gloucestershire GL50 2RS

    Single storey rear extension

    Received 29 Jul, published by the council 6 Aug 2026 Full applications
  • 26/01327/FUL Granted

    Parish Church Of St Paul St Pauls Road Cheltenham Gloucestershire GL50 4EZ

    Installation of solar panels on east and west roof slopes.

    Received 18 Aug, published by the council 27 Aug 2026 Full applications
  • 26/01271/FUL Granted

    32 Horsefair Street Charlton Kings Cheltenham Gloucestershire GL53 8JE

    Single storey side and rear extensions

    Received 10 Aug, published by the council 20 Aug 2026 Full applications