Planning application
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Repair work to Hadley House following rainwater penetration.
As published by the council, reference 24/01674/LBC
Application record
- Reference
- 24/01674/LBC
- Type
- Listed Building Consent
- Status
- Permitted
- Decision
- Grant
- Received
- 8 Oct 2024
- Validated
- 10 Oct 2024
- Decided
- 27 Nov 2024
- Ward
- Lansdown
- Decision by
- Delegated Decision
- Postcode
- GL50 3AW
Site history
Applications at this address on the Cheltenham register
This site has had 6 applications since 2021: 4 approved, 0 refused.
-
26/01014/DISCON Awaiting decision
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Discharge of condition 3 (Demolition and Construction Management Plan) of planning permission 26/00355/FUL.
-
26/00355/LBC Granted
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Refurbishment of existing property including provision of new windows (to rear 1970s addition), provision of photovoltaic cells to flat roof, internal alterations and accessibility improvements
-
26/00355/FUL Granted
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Refurbishment of existing property including provision of new windows (to rear 1970s addition), provision of photovoltaic cells to flat roof, internal alterations and accessibility improvements.
-
25/01732/FUL Granted
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Change of use from a commercial office (Class E) to non-residential educational use with ancillary offices (Class F1).
-
21/02079/CLBW Withdrawn
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
WCs changing to shower rooms, inserting three electric showers and removal of WC pans and urinals, followed by insertion of shower cubicles
Timeline
Dates from the published record
-
8 Oct 2024
Received by Cheltenham
-
10 Oct 2024
Validated
Checked as complete and ready for consideration.
-
27 Nov 2024
Decision issued: Grant
-
22 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Cheltenham
145 applications on PlanIndex · across 12 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cheltenham granted permission on 27 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
WCs changing to shower rooms, inserting three electric showers and removal of WC pans and urinals, followed by insertion of shower cubicles
Withdrawn Heritage and listed buildings 8 docs -
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Change of use from a commercial office (Class E) to non-residential educational use with ancillary offices (Class F1).
Granted Full applications 8 docs -
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Refurbishment of existing property including provision of new windows (to rear 1970s addition), provision of photovoltaic cells to flat roof, internal alterations and accessibility improvements
Granted Heritage and listed buildings Windows or glazing 59 docs -
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
Refurbishment of existing property including provision of new windows (to rear 1970s addition), provision of photovoltaic cells to flat roof, internal alterations and accessibility improvements.
Granted Full applications Windows or glazing 58 docs -
Hadley House Bayshill Road Cheltenham Gloucestershire GL50 3AW
97% historically approved · decision due ~21 Aug
Discharge of condition 3 (Demolition and Construction Management Plan) of planning permission 26/00355/FUL.
Awaiting decision Demolition 2 docs -
The Coach House 3 Parabola Close Cheltenham Gloucestershire GL50 3AN
Non material amendment to Planning Permission 19/01944/FUL - to lower a first floor obscure glazed window and lowering of ridge level to proposed extension over former garage/ store area.
Decided Amendments Extension Windows or glazing 4 docs
Other heritage and listed building applications
In Cheltenham
-
26/01418/LBC Awaiting decision
23 Clarence Square Cheltenham Gloucestershire GL50 4JP
Proposed single-storey rear extension at lower ground floor level, associated internal alterations and reconfiguration, and associated external works.
-
26/01409/LBC Awaiting decision
Scout Headquarters The Burgage Prestbury Cheltenham Gloucestershire GL52 3DN
Redevelopment of the existing scout hut, demolition of existing brick extension and the construction of a new hall with improved access from The Burgage, installation of PV panels and ASHP.
-
26/01377/LBC Awaiting decision
Flat 1 79 Pittville Lawn Cheltenham Gloucestershire GL52 2BP
Extensions, alterations and conversion of the existing outbuilding/garage into a single 2 bedroom dwelling
-
26/01372/LBC Awaiting decision
9 Bath Parade Cheltenham Gloucestershire GL53 7HL
Proposed rear lower ground floor extension, installation of solar panels, and excavation works to lower part of the existing garden level and create a patio area.
-
26/00530/LBC Granted
Cheltenham General Hospital Sandford Road Cheltenham Gloucestershire GL53 7AN
Extension to the Oncology Department including demolition of the modern structure appended to the end of the East Block and associated infrastructure.