Planning application
40 Cleevemount Road Cheltenham Gloucestershire GL52 3HG
Works: Extension Loft or dormer Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing detached garage, construction of single storey side extension, and new dormer extension to rear
As published by the council, reference 21/02322/FUL
Application record
- Reference
- 21/02322/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permit
- Received
- 20 Oct 2021
- Validated
- 21 Oct 2021
- Decided
- 16 Nov 2021
- Ward
- Pittville
- Decision by
- Delegated Decision
- Postcode
- GL52 3HG
Timeline
Dates from the published record
-
20 Oct 2021
Received by Cheltenham
-
21 Oct 2021
Validated
Checked as complete and ready for consideration.
-
16 Nov 2021
Decision issued: Permit
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
48 Cleevemount Road Cheltenham Gloucestershire GL52 3HG
Single storey rear kitchen extension
Granted Full applications Extension 4 docsSmall domestic -
30 Cleevemount Road Cheltenham Gloucestershire GL52 3HG
Single storey side and rear extension.
Granted Full applications Extension 7 docsSmall domestic -
17 Cakebridge Road Cheltenham Gloucestershire GL52 3HL
Single storey rear/side extension and internal alterations
Granted Full applications Extension 9 docsSmall domestic -
17 Cakebridge Road Cheltenham Gloucestershire GL52 3HL
Replacement single garage and erection of annexe
Granted Full applications 10 docs -
7 Cakebridge Road Cheltenham Gloucestershire GL52 3HL
Proposed side canopy
Withdrawn Lawful development 4 docs -
60 Welland Lodge Road Cheltenham Gloucestershire GL52 3HQ
Single storey side and rear extension
Granted Full applications Extension 6 docsSmall domestic
Other full applications applications
In Cheltenham
-
26/01385/FUL Awaiting decision
Abbotsford 24 Old Bath Road Cheltenham Gloucestershire GL53 7QD
Erection of garage with first floor office/study, following removal of existing garage.
-
26/01387/FUL Awaiting decision
41 Hatherley Road Cheltenham Gloucestershire GL51 6EB
Proposed loft conversion with rear dormer.
-
26/00695/FUL Granted
Land At Junction With Warden Hill Road Castanum Court Cheltenham Gloucestershire
Change of use of land to residential and construction of single storey dwelling.
-
26/01377/FUL Awaiting decision
Flat 1 79 Pittville Lawn Cheltenham Gloucestershire GL52 2BP
Extensions, alterations and conversion of the existing outbuilding/garage into a single 2 bedroom dwelling
-
26/01380/FUL Awaiting decision
Scout Headquarters The Burgage Prestbury Cheltenham Gloucestershire GL52 3DN
Redevelopment of the existing scout hut, demolition of existing brick extension and the construction of a new hall with improved access from The Burgage, installation of PV panels and ASHP.