Planning application
Charlton Kings Baptist Church Church Street Charlton Kings Cheltenham Gloucestershire GL53 8AR
Works: Trees
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Five day notice - remove major, dangerous limb from Tree 0944 Western Red Cedar.
As published by the council, reference 21/02067/CACN
Application record
- Reference
- 21/02067/CACN
- Type
- Conservation Area Notification
- Status
- Permitted
- Decision
- Allow 5 day notice
- Received
- 14 Sep 2021
- Validated
- 14 Sep 2021
- Decided
- 14 Sep 2021
- Ward
- Charlton Kings
- Parish
- Charlton Kings
- Decision by
- Delegated Decision
- Postcode
- GL53 8AR
Timeline
Dates from the published record
-
14 Sep 2021
Received by Cheltenham
-
14 Sep 2021
Decision issued: Allow 5 day notice
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Cheltenham has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
10 Little Herberts Road Charlton Kings Cheltenham Gloucestershire GL53 8LZ
96% historically approved · decision due ~25 Jul
Dropped kerb and hardstanding.
Status unknown Full applications 7 docs -
Youth Club Grange Walk Playing Field Horsefair Street Charlton Kings Cheltenham Gloucestershire
Change of use of the land for the siting of 2 no. storage containers
Withdrawn Full applications 10 docs -
46 Buckles Close Charlton Kings Cheltenham Gloucestershire GL53 8QT
Rear extension and garage conversion.
Granted Full applications Extension 11 docs -
Grange Walk Playing Field Horsefair Street Charlton Kings Cheltenham Gloucestershire
New pathway installation
Decided Lawful development 7 docs -
39 Buckles Close Charlton Kings Cheltenham Gloucestershire GL53 8QT
Internal and external changes and improvements to existing detached dwelling.
Granted Full applications New dwelling 7 docsDomestic -
9 Little Herberts Road Charlton Kings Cheltenham Gloucestershire GL53 8LX
Alterations to existing porch, relocation of entrance steps and alterations to front garden to create further off street parking
Granted Full applications Extension 9 docsSmall domestic
Other heritage and listed building applications
In Cheltenham
-
26/01418/LBC Awaiting decision
23 Clarence Square Cheltenham Gloucestershire GL50 4JP
Proposed single-storey rear extension at lower ground floor level, associated internal alterations and reconfiguration, and associated external works.
-
26/01409/LBC Awaiting decision
Scout Headquarters The Burgage Prestbury Cheltenham Gloucestershire GL52 3DN
Redevelopment of the existing scout hut, demolition of existing brick extension and the construction of a new hall with improved access from The Burgage, installation of PV panels and ASHP.
-
26/01377/LBC Awaiting decision
Flat 1 79 Pittville Lawn Cheltenham Gloucestershire GL52 2BP
Extensions, alterations and conversion of the existing outbuilding/garage into a single 2 bedroom dwelling
-
26/01372/LBC Awaiting decision
9 Bath Parade Cheltenham Gloucestershire GL53 7HL
Proposed rear lower ground floor extension, installation of solar panels, and excavation works to lower part of the existing garden level and create a patio area.
-
26/00530/LBC Granted
Cheltenham General Hospital Sandford Road Cheltenham Gloucestershire GL53 7AN
Extension to the Oncology Department including demolition of the modern structure appended to the end of the East Block and associated infrastructure.