Planning application
20 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Works: Roofing Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Resiting of main basement access door; Replacement of 6no. rear facing windows in existing openings; Replacing asbestos/cement slate roof covering with natural slate; enlarging an existing internal basement wall opening.
As published by the council, reference 20/00133/FUL
Application record
- Reference
- 20/00133/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Granted As published: Permit
- Received
- 24 Jan 2020
- Validated
- 25 Jan 2020
- Decided
- 28 Feb 2020
- Ward
- Lansdown
- Decision by
- Delegated Decision
- Postcode
- GL50 2LH
Site history
Applications at this address on the Cheltenham register
This site has had 2 applications since 2020: 2 approved, 0 refused.
-
20/00133/LBC Granted
20 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Resiting of main basement access door; Replacement of 6no. rear facing windows in existing openings; Replacing asbestos/cement slate roof covering with natural slate; enlarging an existing internal basement wall opening.
Timeline
Dates from the published record
-
24 Jan 2020
Received by Cheltenham
-
25 Jan 2020
Validated
Checked as complete and ready for consideration.
-
28 Feb 2020
Decision issued: Permit
-
1 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Marches Conservation Services Agent
5 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cheltenham granted permission on 28 February 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
20 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Resiting of main basement access door; Replacement of 6no. rear facing windows in existing openings; Replacing asbestos/cement slate roof covering with natural slate; enlarging an existing internal basement wall opening.
Granted Heritage and listed buildings Roofing Windows or glazing 15 docs -
15 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Infill rear extension and associated alterations, and installation of solar panels to main roof.
Granted Heritage and listed buildings Extension 23 docs -
15 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Infill rear extension and associated alterations, and installation of solar panels to main roof.
Granted Full applications Extension 24 docs -
18 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Internal and external alterations to a Grade II* listed building including basement remodelling, replacement and alteration of doors and windows, formation of a new window opening, installation of rooflights, replacement of a flat roof, alterations to bathroom accommodation, installation of cast iron gas burners and associated works.
Granted Heritage and listed buildings Loft or dormer Roofing +1 25 docs -
1 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
Removal of Holly Tree
Granted Heritage and listed buildings Trees 3 docs -
11 Lansdown Parade Cheltenham Gloucestershire GL50 2LH
99% historically approved · decision due ~1 Sep
Installation of Air Conditioning in main bedroom on first floor, to include mounting of A/C unit on garden party wall at rear of building, and installation of associated pipework.
Status unknown Heritage and listed buildings 12 docs
Other full applications
In Cheltenham
-
26/01230/FUL Refused
46 Bath Parade Cheltenham Gloucestershire GL53 7HU
Proposed annexe over existing garage and link corridor.
-
26/01372/FUL Granted
9 Bath Parade Cheltenham Gloucestershire GL53 7HL
Proposed rear lower ground floor extension, installation of solar panels, and excavation works to lower part of the existing garden level and create a patio area.
-
26/01208/FUL Granted
New Bungalow Merestones Road Cheltenham Gloucestershire GL50 2RS
Single storey rear extension
-
26/01327/FUL Granted
Parish Church Of St Paul St Pauls Road Cheltenham Gloucestershire GL50 4EZ
Installation of solar panels on east and west roof slopes.
-
26/01271/FUL Granted
32 Horsefair Street Charlton Kings Cheltenham Gloucestershire GL53 8JE
Single storey side and rear extensions