Skip to content
PlanIndex Get alerts
Menu

Planning application

20 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

Granted Cheltenham 20/00133/FUL Full Planning Permission

Works: Roofing Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Resiting of main basement access door; Replacement of 6no. rear facing windows in existing openings; Replacing asbestos/cement slate roof covering with natural slate; enlarging an existing internal basement wall opening.

As published by the council, reference 20/00133/FUL

Application record

Reference
20/00133/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permit
Received
24 Jan 2020
Validated
25 Jan 2020
Decided
28 Feb 2020
Ward
Lansdown
Decision by
Delegated Decision
Postcode
GL50 2LH

Site history

Applications at this address on the Cheltenham register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • 20/00133/LBC Granted

    20 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    Resiting of main basement access door; Replacement of 6no. rear facing windows in existing openings; Replacing asbestos/cement slate roof covering with natural slate; enlarging an existing internal basement wall opening.

    Decided 28 Feb 2020 Heritage and listed buildings

Timeline

Dates from the published record

  1. 24 Jan 2020

    Received by Cheltenham

  2. 25 Jan 2020

    Validated

    Checked as complete and ready for consideration.

  3. 28 Feb 2020

    Decision issued: Permit

  4. 1 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Marches Conservation Services Agent

5 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cheltenham granted permission on 28 February 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 20 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    20/00133/LBC Submitted 24 Jan 2020 1m away

    Resiting of main basement access door; Replacement of 6no. rear facing windows in existing openings; Replacing asbestos/cement slate roof covering with natural slate; enlarging an existing internal basement wall opening.

    Granted Heritage and listed buildings Roofing Windows or glazing 15 docs
  • 18 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    26/00169/LBC Submitted 2 Feb 2026 13m away

    99% historically approved · decision due ~31 Mar

    Internal alterations including new lower ground floor structure, utility room arrangement altered, new screen with French doors to rear, replacement of French door to the front at basement level, replacement windows to the rear and new shower room at first floor.

    Status unknown Heritage and listed buildings Windows or glazing 25 docs
  • 15 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    25/02034/LBC Submitted 18 Dec 2025 29m away

    Infill rear extension and associated alterations, and installation of solar panels to main roof.

    Granted Heritage and listed buildings Extension 24 docs
  • 15 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    25/02034/FUL Submitted 18 Dec 2025 30m away

    Infill rear extension and associated alterations, and installation of solar panels to main roof.

    Granted Full applications Extension 25 docs
  • 11 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    26/00901/LBC Submitted 3 Jun 2026 30m away

    99% historically approved · decision due ~1 Sep

    Installation of Air Conditioning in main bedroom on first floor, to include mounting of A/C unit on garden party wall at rear of building, and installation of associated pipework.

    Awaiting decision Heritage and listed buildings 12 docs
  • 1 Lansdown Parade Cheltenham Gloucestershire GL50 2LH

    19/01070/CACN Submitted 30 May 2019 31m away

    Removal of Holly Tree

    Granted Heritage and listed buildings Trees 3 docs

In Cheltenham

  • 26/00962/FUL Decided

    The Yard Exmouth Court 1 Exmouth Street Cheltenham Gloucestershire GL53 7NR

    Erection of a self-build dwelling.

    16 Jun 2026 Full applications
  • 26/01478/FUL Awaiting decision

    3 The Verneys Cheltenham Gloucestershire GL53 7DB

    Removal of a failing wall and replacement with wooden fencing.

    15 Sep 2026 Full applications
  • 26/01233/FUL Granted

    40 Cudnall Street Charlton Kings Cheltenham Gloucestershire GL53 8HG

    Alterations and extension to dwelling, and erection of outbuilding. 

    31 Jul 2026 Full applications
  • 26/01155/FUL Granted

    3 Whitethorn Cottages Dark Lane Cheltenham Gloucestershire GL51 9RW

    Rear single storey extension and first floor bedroom extension.

    17 Jul 2026 Full applications
  • 26/01467/FUL Awaiting decision

    Lancaster House 2 Sovereign View Cheltenham Gloucestershire GL52 6FD

    Erection of a first floor extension, external staircase and an outbuilding within garden curtilage to provide home office and storage space, plus the replacement of existing balustrades.

    14 Sep 2026 Full applications