Planning application
17 High Street Chelmsford CM1 1BE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Certificate of Lawfulness for Proposed Use within Commercial, Business and Service (Class E)
As published by the council, reference 26/01101/CLOPUD
Application record
- Reference
- 26/01101/CLOPUD
- Category
- Lawful development
- Status
- Pending Consideration
- Validated
- 12 Aug 2026
- Postcode
- CM1 1BE
Timeline
Dates from the published record
-
12 Aug 2026
Validated
Checked as complete and ready for consideration.
-
28 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Chelmsford took a median of 55 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Chelmsford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
Wendys 9 - 10 High Street Chelmsford CM1 1BE
69% historically approved · decision due ~6 Aug
1 internally illuminated fascia sign, 3 off set of internally illuminated red neon faux letters, 1 internally illuminated projection sign
Decided Advertising -
Barclays 40 - 41 High Street Chelmsford CM1 1BE
69% historically approved · decision due ~3 Sep
x2 ATM Surround Collars.
Awaiting decision Advertising -
Barclays 40 - 41 High Street Chelmsford CM1 1BE
69% historically approved · decision due ~3 Sep
x2 ATM Surround Collars.
Awaiting decision Advertising -
Barclays 40 - 41 High Street Chelmsford CM1 1BE
86% historically approved · decision due ~3 Sep
Remove and replace x1 ATM, remove and replace existing glazing with new aluminium security panel.
Awaiting decision Full applications Windows or glazing -
Schuh 15 - 16 High Street Chelmsford CM1 1BE
Installation of illuminated digital signage on existing building
Refused Heritage and listed buildings 6 docs -
Schuh 15 - 16 High Street Chelmsford CM1 1BE
Installation of Illuminated Digital Signage on Existing Building.
Refused Advertising 6 docs
Other lawful development applications
In Chelmsford
-
26/01009/CLOPUD Awaiting decision
38 Brock Hill Runwell Wickford SS11 7NJ
Extension to existing side dormer and addition of new side facing dormer.
-
26/01137/CLOPUD Awaiting decision
Bywood House The Ridge Little Baddow Chelmsford Essex CM3 4RU
Removal of existing rear bedroom window, enlargement of existing opening and installation of French doors, side lights and Juliette railings. Installation of two retractable awnings to the rear elevation.
-
26/01095/CLEUD Awaiting decision
Belle Vue The Ridge Little Baddow Chelmsford Essex CM3 4RT
Certificate of lawfulness to regularise the retention of the former dwelling on the site where condition 9 of planning permission 14/00420/FUL has not been complied with.
-
26/01031/CLOPUD Awaiting decision
18 Langdale Gardens Chelmsford Essex CM2 9QH
Construction of hip to gable loft conversion, with rear facing dormer, roof lights to front elevations. Construction of box dormer to the rear.
-
26/01071/CLOPUD Awaiting decision
6 Middleton Row South Woodham Ferrers Chelmsford Essex CM3 5WE
Demolition of existing conservatory and construction of new single storey extension