Skip to content
PlanIndex Get alerts
Menu

Planning application

23/01919/DOC/1

Brooks Bros Timber Yard Twitty Fee Danbury Chelmsford Essex CM3 4PG

Granted Chelmsford Conditions

Proposal

Condition 3 - surface water drainage scheme

As published by the council, reference 23/01919/DOC/1

Timeline

Dates from the published record

  1. 18 Jun 2024

    Received by Chelmsford

  2. 8 Oct 2024

    Decision issued: Granted subject to conditions

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 19/05117/TPO Granted

    Lyndale Twitty Fee Danbury Chelmsford Essex CM3 4PG

    T3 Oak (T1 on plan)- Fell and treat stump - Reason: Works are proposed as a remedy to the differential foundation movement at the insured property and to ensure the long-term stability of the building.

    6 Aug 2019 26m away Trees
  • 19/05118/TPO Granted

    Lyndale Twitty Fee Danbury Chelmsford Essex CM3 4PG

    Oak (T2) - Canopy reduction of 7m - Repeat work in 2021 and 2023 to same specifications - Reasons: Remedy to the differential foundation movement at the insured property and to ensure the long-term stability of the building.

    6 Aug 2019 30m away Trees
  • 25/01621/FUL Awaiting decision

    Brooks Bros Timber Yard Twitty Fee Danbury Chelmsford Essex CM3 4PG

    Erection of an ancillary surface-mounted storage building.

    28 Nov 2025 112m away Full applications
  • 19/01767/FUL Granted

    Woodend Cat Hotel Site At 77 Hopping Jacks Lane Danbury Chelmsford

    Demolition of existing cattery and construction of a new residential property with private entrance off Runsell Lane and new timber canopy.

    29 Oct 2019 486m away Full applications
  • 19/01209/FUL Granted

    Woodend Cat Hotel 77 Hopping Jacks Lane Danbury Chelmsford CM3 4PD

    Resubmission of previously approved application 18/00627/FUL (Demolition of existing cattery and construction of a new residential dwelling). Amendment to the vehicle access route.

    12 Jul 2019 487m away Full applications

In Chelmsford

  • 24/01348/DOC/2 Awaiting decision

    Whitegates Woodham Road Rettendon Wickford Essex SS11 7QW

    Condition 3 - Biodiversity Net Gain Plan (The BNG Plan) Conditon 4 - Habitat Management and Monitoring Plan (HMMP) Condition 5 - Materials

    13 Jan 2026 Conditions
  • 25/01229/DOC/2 Awaiting decision

    5 Glebe View Chelmsford CM2 8PZ

    Condition 5 - Boundary treatments, Condition 6 - Storage of refuse and recyclable materials, Condition 9 - Secure and covered bicycle parking, Condition 10 - Hard and Soft landscaping

    27 Jul 2026 Conditions
  • 25/01456/DOC/1 Awaiting decision

    58 Writtle Road Chelmsford CM1 3BU

    Condition 3 - Materials, Condition 5 - Contamination & Condition 11 - Construction Management Plan

    23 Jul 2026 Conditions
  • 26/00467/DOC/1 Awaiting decision

    The Millstone Main Road Little Waltham Chelmsford Essex CM3 3PF

    Condition 4 - Written Scheme of Investigation

    23 Jul 2026 Conditions
  • 21/00555/DOC/9 Awaiting decision

    Hanningfield Ltd Southend Road East Hanningfield Chelmsford Essex CM2 7FU

    Condition 4 - Details of the final location, design, materials and acoustic attenuation - panel arrays, transformers, inverters, control room, substations, power conversion system, HVAC unit, all auxiliary buildings

    23 Jul 2026 Conditions