Skip to content
PlanIndex Get alerts
Menu

Planning application

23/01048/DOC/1

70 High Street Great Baddow Chelmsford CM2 7HH

Granted Chelmsford Conditions

Proposal

Condition 3 - Internal Wall coverings and finishes, Flooring, External Finishes (Paint colour), External Joinery, Internal Decoration Condition 4 - Doors, Door Casings & Surrounds, Chimney Cowls, External Vent/Flue covers, Lighting

As published by the council, reference 23/01048/DOC/1

Timeline

Dates from the published record

  1. 18 Sep 2024

    Received by Chelmsford

  2. 8 Oct 2024

    Decision issued: Granted subject to conditions

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 24/05679/CAT Granted

    The White Horse 76 - 78 High Street Great Baddow Chelmsford CM2 7HH

    Ash trees x3- 4 m lateral reduction of overhanging branches from 3 trees (length of hedge line measures 8 m) into no.4 Galleywood Road's garden

    16 Sep 2024 0m away Trees
  • 19/01927/DOC/1 Granted

    Bankura 72 High Street Great Baddow Chelmsford Essex CM2 7HH

    Condition 3 - Samples of Materials.

    8 Apr 2020 0m away Conditions
  • 19/01791/FUL Granted

    Land South Of The Bell Centre Bell Street Great Baddow Chelmsford

    Construction of 2 flats and all associated development

    25 Nov 2019 18m away Full applications
  • 19/01382/FUL Withdrawn

    Land South Of The Bell Centre Bell Street Great Baddow Chelmsford

    Proposed new dwelling.

    16 Aug 2019 18m away Full applications
  • 26/00776/ADV Awaiting decision

    Baddow Body Art 53 High Street Great Baddow Chelmsford CM2 7HJ

    New hanging signage and barber pole to the front elevation

    25 Jun 2026 23m away Advertising
  • 17/00663/DOC/1 Granted

    Bell House Bell Street Great Baddow Chelmsford CM2 7JS

    Condition 2 - Large scale drawings showing: windows, vents, flues, extractor fans, meter boxes, internal & external drainage, fire & sound insulation.

    11 Nov 2019 35m away Conditions

In Chelmsford

  • 24/01348/DOC/2 Awaiting decision

    Whitegates Woodham Road Rettendon Wickford Essex SS11 7QW

    Condition 3 - Biodiversity Net Gain Plan (The BNG Plan) Conditon 4 - Habitat Management and Monitoring Plan (HMMP) Condition 5 - Materials

    13 Jan 2026 Conditions
  • 25/01229/DOC/2 Awaiting decision

    5 Glebe View Chelmsford CM2 8PZ

    Condition 5 - Boundary treatments, Condition 6 - Storage of refuse and recyclable materials, Condition 9 - Secure and covered bicycle parking, Condition 10 - Hard and Soft landscaping

    27 Jul 2026 Conditions
  • 25/01456/DOC/1 Awaiting decision

    58 Writtle Road Chelmsford CM1 3BU

    Condition 3 - Materials, Condition 5 - Contamination & Condition 11 - Construction Management Plan

    23 Jul 2026 Conditions
  • 26/00467/DOC/1 Awaiting decision

    The Millstone Main Road Little Waltham Chelmsford Essex CM3 3PF

    Condition 4 - Written Scheme of Investigation

    23 Jul 2026 Conditions
  • 21/00555/DOC/9 Awaiting decision

    Hanningfield Ltd Southend Road East Hanningfield Chelmsford Essex CM2 7FU

    Condition 4 - Details of the final location, design, materials and acoustic attenuation - panel arrays, transformers, inverters, control room, substations, power conversion system, HVAC unit, all auxiliary buildings

    23 Jul 2026 Conditions