Skip to content
PlanIndex Get alerts
Menu

Planning application

22/01410/DOC/1

Poplar Lodge Well Lane Danbury Chelmsford Essex CM3 4AB

Granted Chelmsford Conditions

Proposal

Condition 3 - Finished levels; Condition 6 - Charging infrastructure for electric vehicles; Condition 7 - Water efficiency; Condition 8 - Obscured windows

As published by the council, reference 22/01410/DOC/1

Timeline

Dates from the published record

  1. 7 Dec 2022

    Received by Chelmsford

  2. 16 Dec 2022

    Decision issued: Granted subject to conditions

  3. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 22/01410/DOC/2 Awaiting decision

    Poplar Lodge Well Lane Danbury Chelmsford Essex CM3 4AB

    Condition 4(a) - Boundary treatment, Condition 5 - Hard and soft landscape work,

    12 Aug 2024 0m away Conditions
  • 25/00833/DOC/1 Awaiting decision

    Nightingales Well Lane Danbury Chelmsford Essex CM3 4AB

    Condition 10 - Construction Environmental Management Plan (CEMP)

    17 Apr 2026 0m away Conditions
  • 21/02228/FUL Withdrawn

    Poplar Lodge Well Lane Danbury Chelmsford Essex CM3 4AB

    Two storey front extension, single storey side extension, first floor side extension. Raising of the existing roof ridge height to form second floor. Alterations to fenestration.

    22 Nov 2021 64m away Full applications
  • 21/01490/FUL Granted

    19 Daen Ingas Danbury Chelmsford Essex CM3 4DB

    Proposed single storey rear extension.

    11 Aug 2021 105m away Full applications
  • 19/01990/FUL Granted

    12 The Heights Danbury Chelmsford Essex CM3 4AG

    Single storey front extension

    5 Dec 2019 120m away Full applications
  • 19/05552/CAT Granted

    Clinic 141 Main Road Danbury Chelmsford CM3 4AA

    (G1) - 10x Conifer - Rear garden, opposite school entrance - Fell to ground level - Reason: For safety precaution; (G1) - Elm trees - Near roadside - Reduce back to previous points by 2-3m - Reason: To match the existing elm/holly hedge line.

    26 Jun 2019 150m away Trees

In Chelmsford

  • 24/01348/DOC/2 Awaiting decision

    Whitegates Woodham Road Rettendon Wickford Essex SS11 7QW

    Condition 3 - Biodiversity Net Gain Plan (The BNG Plan) Conditon 4 - Habitat Management and Monitoring Plan (HMMP) Condition 5 - Materials

    13 Jan 2026 Conditions
  • 25/01229/DOC/2 Awaiting decision

    5 Glebe View Chelmsford CM2 8PZ

    Condition 5 - Boundary treatments, Condition 6 - Storage of refuse and recyclable materials, Condition 9 - Secure and covered bicycle parking, Condition 10 - Hard and Soft landscaping

    27 Jul 2026 Conditions
  • 25/01456/DOC/1 Awaiting decision

    58 Writtle Road Chelmsford CM1 3BU

    Condition 3 - Materials, Condition 5 - Contamination & Condition 11 - Construction Management Plan

    23 Jul 2026 Conditions
  • 26/00467/DOC/1 Awaiting decision

    The Millstone Main Road Little Waltham Chelmsford Essex CM3 3PF

    Condition 4 - Written Scheme of Investigation

    23 Jul 2026 Conditions
  • 21/00555/DOC/9 Awaiting decision

    Hanningfield Ltd Southend Road East Hanningfield Chelmsford Essex CM2 7FU

    Condition 4 - Details of the final location, design, materials and acoustic attenuation - panel arrays, transformers, inverters, control room, substations, power conversion system, HVAC unit, all auxiliary buildings

    23 Jul 2026 Conditions