Planning application
32 Mill Lane Danbury Chelmsford Essex CM3 4LB
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Front extension
As published by the council, reference 20/01407/FUL
Application record
- Reference
- 20/01407/FUL
- Type
- Full
- Status
- Application Permitted
- Decision
- Granted As published: Permitted
- Received
- 7 Sep 2020
- Validated
- 7 Sep 2020
- Decided
- 30 Oct 2020
- Postcode
- CM3 4LB
Timeline
Dates from the published record
-
7 Sep 2020
Received by Chelmsford
-
30 Oct 2020
Decision issued: Permitted
-
10 Sep 2026
Added to PlanIndex
Documents
13 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Chelmsford granted permission on 30 October 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
34 Mill Lane Danbury Chelmsford CM3 4LB
T1 (TPO/1997/016) and T1 (TPO/1993/003, T2 on map) - Oaks: Crown reduce by a maximum of 2.5-3m cutting to previous pruning points to maintain the health of the trees and reduce their encroachment.
Granted Trees 4 docs -
26 Mill Lane Danbury Chelmsford Essex CM3 4LB
Erection of single storey rear extension
Granted Full applications Extension 6 docsSmall domestic -
34A Mill Lane Danbury Chelmsford Essex CM3 4LB
T1 Oak - rear garden - Crown reduce to previous pruning points by up to 3m maximum and remove deadwood. All cuts to be made to a suitable growth point - Reason: The tree is in a maintenance regime to ensure it does not become too large for it's location and to reduce the risk of branch/limb failure.
Granted Trees 4 docs -
53 Mill Lane Danbury Chelmsford Essex CM3 4LB
T10 Oak crown lift northeast aspect of crown by 5metres and crown reduce southwest aspect of crown by 2metres. Reason: more symmetrical and to stop it catching on passing lorries. There is a large branch also growing very near the house.
Granted Trees 4 docs -
24 Mill Lane Danbury Chelmsford Essex CM3 4LB
Single storey side and rear extensions
Granted Full applications Extension 12 docsSmall domestic -
6 Danbury Vale Danbury Chelmsford CM3 4LA
T1 - Oak - Rear garden - Overall crown reduction by approximately 5 metres, removal of overhanging branches to 18 Danbury Vale back to trunk, thin knuckles by removing half number of sub-laterals. Reason: Excessive overhang/breach of boundary, encroachment of roof area, tree stress due to size and excessive shading.
Granted Trees 4 docs
Other full applications
In Chelmsford
-
26/01514/FUL Awaiting decision
Chelmsford Retail Market High Chelmer Multistorey Building Bellmead Chelmsford CM1 1LE
Erection of two illuminated public artworks at either end of Cornhill Chelmsford.
-
26/01471/FUL Awaiting decision
122 Brock Hill Runwell Wickford SS11 7NX
Proposed replacement porch.
-
26/01153/FUL Awaiting decision
The Old Hanger Ingatestone Road Stock Ingatestone Essex CM4 9PD
Retrospective application for an ancillary garden recreation building
-
26/01549/FUL Awaiting decision
27 Chignal Road Chelmsford CM1 2JA
Removal of existing shed and storm porch. Construction of single storey side extension and new front porch.
-
26/01492/FUL Awaiting decision
92 Bodmin Road Chelmsford CM1 6LL
Proposed split of existing dwelling into no.2 dwellings. Proposed rear dormer to match the existing. Proposed alterations to doors and fenestrations to the front, rear, and side elevations. Additional side window at first-floor level. Proposed alterations to the existing dropped kerb and proposed new dropped kerb.