Planning application
Braintree District Council CM7 9HB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Horizon 120 Land West Of A131 London Road Great Notley Essex - Proposed Local Development Order for the creation of a Business and Innovation Park comprising B1(a) (Office); B1(b) (Research and Development); B1(c) Industrial Process; B2 (General Industrial) and B8 (Storage or Distribution) uses, and within Zone A of the proposed development a C1 (Hotel) (maximum 120 bed spaces); and buildings within the Horizon Hub area where the following uses will be permitted, subject to restrictions on internal floor area: A1 (Shop; maximum 300sq.m); A3 (Restaurant and Café; maximum 100sq.m); D1(a) (Medical or Health Services; maximum 150sq.m.); Early Years Childcare, Day Nursery or Preschool within Use Class D1(b) (maximum 350sq.m); Gymnasium within Use Class D2(e) (maximum 700sq.m.) along with associated structural landscaping and infrastructure
As published by the council, reference 20/00203/OBS3
Application record
- Reference
- 20/00203/OBS3
- Status
- No Objection
- Decision
- Permitted
- Received
- 10 Feb 2020
- Validated
- 10 Feb 2020
- Decided
- 4 Mar 2020
- Postcode
- CM7 9HB
Timeline
Dates from the published record
-
10 Feb 2020
Received by Chelmsford
-
4 Mar 2020
Decision issued: Permitted
-
25 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Chelmsford is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Braintree District Council CM7 9HB
Erection of three single-storey buildings to provide 1928sqm Light Industrial (B1) floor space (20 flexible units), associated parking, cycle parking and landscaping. - Lynderswood Farm, London Road, Black Notley.
Granted 3 docsSmall domestic -
Braintree District Council Chelmsford Essex CM7 9HB
88% historically approved · decision due ~20 Oct
Land East Of Great Notley (Hayeswood), North Of Bakers Lane And East Of London Road, Black Notley, Braintree - Outline planning application with all matters reserved except for vehicular access, for the demolition of existing buildings, works to existing listed buildings, and the erection of up to 1,650 new residential dwellings (Class C2 and C3); a primary school (Class F1(a)); early years provision (Class E (f)); a mixed-use neighbourhood centre and local centre (comprising a mix of employment, commercial, retail, and community uses (Class E (a - g)); a Community Centre (Class F2 (b), E (d)) and formal Sports Park; together with new green infrastructure, highways and cycle infrastructure, drainage infrastructure and utilities infrastructure; diversion of Public Rights of Way (PRoW) (Footpath 31 Black Notley); undergrounding of overhead power lines and erection of new termination towers; associated earthworks and noise bund; and all other associated and necessary infrastructure (THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL STATEMENT).
Awaiting decision Demolition