Skip to content
PlanIndex Get alerts
Menu

Planning application

76 Beehive Lane Great Baddow Chelmsford CM2 9RX

Granted Chelmsford 19/00989/FUL Full

Works: Extension Roofing Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of detached garage, single storey side and rear extension, with part pitched and part flat roof. Alterations to existing conservatory to form a habitable room, with solid flat roof and glazed lantern.

As published by the council, reference 19/00989/FUL

Application record

Reference
19/00989/FUL
Type
Full
Status
Application Permitted
Decision
Permitted
Received
4 Jun 2019
Validated
4 Jun 2019
Decided
30 Jul 2019
Postcode
CM2 9RX

Timeline

Dates from the published record

  1. 4 Jun 2019

    Received by Chelmsford

  2. 30 Jul 2019

    Decision issued: Permitted

  3. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 84 Beehive Lane Great Baddow Chelmsford CM2 9RX

    22/02207/FUL Submitted 22 Dec 2022 53m away

    Demolition of existing side outbuilding; construction of single storey front extension and two storey side extension, with rendering to the front and rear of the existing dwelling, and internal alterations.

    Refused Full applications Extension Demolition 6 docs
    Small domestic
  • 35 Sawkins Gardens Great Baddow Chelmsford Essex CM2 9SD

    20/00313/FUL Submitted 25 Feb 2020 57m away

    Two storey side, single storey rear extensions, and loft conversion with box dormer.

    Granted Full applications Extension Loft or dormer 8 docs
    Small domestic
  • 135 Beehive Lane Great Baddow Chelmsford CM2 9RX

    22/01205/NMAT/2 Submitted 24 Mar 2025 66m away

    Non-material amendment to planning permission - 22/01205/FUL - (Demolition of the existing rear conservatory and bay window; construction of single storey rear extension) Change to dimensions of the rear extension single storey and keep existing bay window.

    Refused Amendments Extension Demolition +1 5 docs
    Small domestic
  • 15 Apple Way Great Baddow Chelmsford CM2 9HX

    19/00147/FUL Submitted 1 Feb 2019 77m away

    Rear single storey extension.

    Granted Full applications Extension 11 docs
    Small domestic
  • Site At 137 Beehive Lane Great Baddow Chelmsford

    20/00791/FUL Submitted 4 Jun 2020 90m away

    Change of use from office to 10 residential apartments (use class C3). Construction of part ground, first and second floor extensions to the front, side and rear. Creation of associated parking areas with bin and cycle store.

    Granted Full applications New dwelling Extension 24 docs
  • Hampton House 137 Beehive Lane Great Baddow Chelmsford CM2 9RX

    19/01980/CUPAO Submitted 2 Dec 2019 95m away

    Determination as to whether the prior approval of the local planning authority is required for the change of use of a building from office use (Class B1(a)) to 7no. residential units (Class C3).

    Granted Outline 8 docs

In Chelmsford

  • 26/01139/FUL Awaiting decision

    Kings Court House Cooksmill Green Highwood Chelmsford Essex CM1 3SJ

    Proposed single storey extension. Landscaping alterations and associated operational development. External pergola

    Full applications
  • 26/01143/FUL Awaiting decision

    9 Trenchard Crescent Springfield Chelmsford Essex CM1 6FA

    Single storey rear extension.

    Full applications
  • 26/01105/FUL Awaiting decision

    Kents Farm Kents Farm Lane West Hanningfield Chelmsford Essex CM2 8XG

    Single storey ground floor rear extensions, replacement front porch, relocation of existing granary, internal and external alterations.

    Full applications
  • 26/00515/FUL Refused

    72 Cherwell Drive Chelmsford Essex CM1 2JL

    Dropped kerb and hard standing

    6 May 2026 Full applications
  • 26/01186/FUL Awaiting decision

    Bulls Lodge Barn Bulls Lodge Farm Generals Lane Boreham Chelmsford Essex CM3 3HN

    Proposed single storey side and rear extension and internal changes. Alterations to fenestration including the reinstatement of barn doors (held open). Conversion and extension to existing cartlodge to become guest annex. Alterations to the existing parking area. Access ramp to provide level access into barn

    Full applications