Planning application
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Part of this application was approved and part refused. The decision notice on the council portal sets out which is which.
Proposal
CONDITION 4 - Ecology survey updates; CONDITION 12 - Hard/soft landscaping management plan; CONDITION 14 (North Island) - Samples of materials; CONDITION 15(i) - Lighting plan; CONDITION 16 (North Island) - Large scale drawing of building detailing; CONDITION 24 - Designs for 4no. new foot/cycle bridges; CONDITION 25 - Schedule of works for the restoration of the 1 no. existing pedestrian pipe bridge; CONDITION 26 - Designs for the improvement of the 2no. existing vehicle bridges; CONDITION 30 - Details of the means to safeguard emergency access and operational capabilities and emergency services; CONDITION 42 - Public art statement
As published by the council, reference 18/01326/DOC/3
Application record
- Reference
- 18/01326/DOC/3
- Type
- Conditions
- Status
- Split Decision
- Decision
- Part approved, part refused As published: Split Decision
- Received
- 3 Sep 2020
- Validated
- 3 Sep 2020
- Decided
- 24 Mar 2021
Site history
Applications at this address on the Chelmsford register
This site has had 10 applications since 2018: 8 approved, 0 refused.
-
25/00274/FUL Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Demolition of existing buildings and redevelopment of site to provide hotel (C1), office space (E(g)(i)) including workplace day childcare, restaurant (E(b)), and student accommodation (sui generis) with ancillary spaces. Erection of new pedestrian bridges, associated parking provision, infrastructure, hard and soft landscaping.
-
18/01326/NMAT/4 Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Non-material amendment to planning permission 18/01326/FUL (Redevelopment to provide a mixed use scheme containing 315 student dwellings and flexible D1/B1/B8 uses and retained D2 use class (leisure) comprising buildings of 3-5 storeys (Blocks A - D). Erection of new pedestrian bridges linking the site with Anglia Ruskin University and the Local Nature Reserve, new public spaces, hard & soft landscaping & associated parking provision & infrastructure.) to allow for the implementation of a monitoring mechanism in relation to cycle provision based within the ground floor of a six-storey building primarily utilised as student accommodation positioned on the northern island - referred to as Block B.
-
18/01326/DOC/10 Withdrawn
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Condition 40 -Foul Water Drainage Strategy
-
18/01326/DOC/9 Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Condition 38 - surface water drainage system
-
18/01326/DOC/4 Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Condition 27 - Parking management strategy, Condition 33 - Electric vehicle charging points, Condition 36 - Confirmed management arrangement for the collection of refuse and recycling receptacles.
-
18/01326/DOC/2 Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Condition 8 - Tree works method statement; Condition 9 - Tree protection plan; Condition 10 - Planting plan; Condition 18 - Boundary treatment deails; Condition 21 - Construction method statement
-
18/01326/DOC/1 Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Condition 13 - Finished levels
-
18/01326/NMAT/1 Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Non-material amendment to planning permission 18/01326/FUL (Redevelopment to provide a mixed use scheme containing 315 student dwellings and flexible D1/B1/B8 uses and retained D2 use class (leisure) comprising buildings of 3-5 storeys (Blocks A - D). Erection of new pedestrian bridges linking the site with Anglia Ruskin University and the Local Nature Reserve, new public spaces, hard & soft landscaping & associated parking provision & infrastructure). Variation to conditions 10, 15, 18, 24, 25, 26, 30 to trigger at 6 months from commencement instead of 3 months.
-
18/00573/EIASO Granted
Rivermead Industrial Estate Bishop Hall Lane Chelmsford
Environmental Impact Assessment Screening Opinion for retention of, and extensions to, existing building on Rivermead North, and the erection of a 3-5 storey building to provide a maximum of 350 student dwellings on Rivermead North, including the retention of existing leisure uses; The demolition of existing commercial buildings on Rivermead South to allow for the erection of two 3-5 storey buildings providing a maximum of 10,000m2 of flexible office, light industrial, and research & development floorspace on Rivermead South; the erection of two new pedestrian bridges linking the site with Anglia Ruskin University and the Local Nature Reserve; and landscaping and ecological benefits, including the creation of a new wetland.
Timeline
Dates from the published record
-
3 Sep 2020
Received by Chelmsford
-
24 Mar 2021
Decision issued: Split Decision
-
21 Nov 2026
Added to PlanIndex
Documents
92 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
After the decision
Chelmsford has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Chelmsford
-
26/00813/DOC/1 Granted
Bluebell Barn Graces Lane Little Baddow Chelmsford Essex CM3 4AY
Condition 4 - Contamination Condition 11 - Construction Environmental (ecological) Management Plan (CEMP)
-
26/00415/DOC/1 Awaiting decision
8 High Pastures Little Baddow Chelmsford Essex CM3 4TS
Condition 4 - dwg 10 - Materials
-
21/00555/DOC/14 Awaiting decision
Hanningfield Ltd Southend Road East Hanningfield Chelmsford Essex CM2 7FU
Condition 9 - Lighting
-
26/00220/DOC/1 Granted
14 Maltings Road Battlesbridge Wickford Essex SS11 7RF
Condition 3 - Materials
-
26/00276/DOC/1 Awaiting decision
Top Farm Black Chapel Lane Great Waltham Dunmow CM6 3PH
Condition 3 - Material schedule, Condition 4 - Large scale details