Planning application
Land Adj 5 Dakyn Drive Stock Ingatestone Essex
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Detached dwelling.
As published by the council, reference 18/00866/FUL
Application record
- Reference
- 18/00866/FUL
- Type
- Full
- Status
- Application Refused
- Decision
- Refused
- Received
- 17 May 2018
- Validated
- 17 May 2018
- Decided
- 8 Aug 2018
Site history
Applications at this address on the Chelmsford register
This site has had 2 applications since 2018: 0 approved, 2 refused.
-
18/02123/FUL Refused
Land Adj 5 Dakyn Drive Stock Ingatestone Essex
Detached dwelling.
Timeline
Dates from the published record
-
17 May 2018
Received by Chelmsford
-
8 Aug 2018
Decision issued: Refused
-
1 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this refusal means
Chelmsford refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Adj 5 Dakyn Drive Stock Ingatestone Essex
Detached dwelling.
Refused Full applications New dwelling 8 docsDomestic -
5 Dakyn Drive Stock Ingatestone Essex CM4 9DJ
T1 -Oak - Crown reduction of 5-6m, back to suitable growing points. Reason: health and safety grounds, and to prevent further limb failure.
Refused Trees 6 docs -
5 Dakyn Drive Stock Ingatestone Essex CM4 9DJ
T1 - Oak - Corner of Dakyn Drive/Brookmans Road - works to balance the tree following the works to be carried out under consent of ref 21/05119/TPO and the work proposed under Dead and Dangerous exemption 21/05952/DD, notified separately; the additional work involves the reduction of the branches on the south side of the tree closest to the house by up to 2m to prevent lever arm failure and rebalance the tree as a whole. Reason: The work already carried out has left the tree unbalanced, with the clear potential for lever arm failure, on the branches extending towards 5 Dakyn Drive - see accompanying photos
Granted Trees 4 docs -
6 Dakyn Drive Stock Ingatestone Essex CM4 9DJ
Provision of new ramp and landing area with handrails to facilitate access.
Granted Full applications 8 docs -
9 Dakyn Drive Stock Ingatestone Essex CM4 9DJ
Single Storey Rear Extension
Granted Full applications Extension 7 docsSmall domestic -
Block 1 To 8 Vernon Corner Stock Billericay CM4 9TD
Cherry x 2 (T1 and T2) - Reduce crown by 2.5 metres - Reason: To maintain health of trees and prevent interference between trees and buildings.
Granted Trees 4 docs
Other full applications
In Chelmsford
-
26/01336/FUL Awaiting decision
Great Oaks Main Road Little Waltham Chelmsford Essex CM3 3PA
Demolition of an existing workshop building and construction of a new dwelling.
-
26/01221/FUL Awaiting decision
9 Butterfield Road Boreham Chelmsford Essex CM3 3BP
Single storey rear extension.
-
26/01418/FUL Awaiting decision
7 Edward Drive Chelmsford Essex CM2 9ER
Single storey side extension and loft conversion with rear dormer, front facing roof light and second floor side window.
-
26/01317/FUL Awaiting decision
50 Wilfred Waterman Drive Chelmsford Garden Community Chelmsford CM1 6AZ
Installation of 26 solar panels
-
26/01330/FUL Awaiting decision
Unit 2 19 Queen Elizabeth Ii Square South Woodham Ferrers Chelmsford Essex CM3 5TD
Removal of existing home shopping lockers, creating 2No. New Click and Collect Bays.