Parcel 5, Houghton Regis North 1, Sundon Road, Houghton Regis, LU5 5GX

Granted Central Bedfordshire CB/26/02428/NMA Non-material Change to Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non material amendment to planning permission CB/24/01505/RM. Amendment sought (amend plot 160 from fully buff brick to half buff brick and half cladding)

As published by the council, reference CB/26/02428/NMA

Application record

Reference
CB/26/02428/NMA
Type
Non-material Change to Permission
Status
Decided
Decision
Non-Material Amendment - Granted
Received
4 Aug 2026
Validated
5 Aug 2026
Decided
20 Aug 2026
Parish
Houghton Regis
Decision by
Officer Delegated
Postcode
LU5 5GX

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by Central Bedfordshire

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. 14 Aug 2026

    Status changed to Pending

    Previously Registered.

  5. 20 Aug 2026

    Decision issued: Non-Material Amendment - Granted

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Central Bedfordshire granted permission on 20 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Houghton Regis North Site 1, Sundon Road, Houghton Regis, LU5 5GX

    CB/23/03814/DOC Submitted 27 Nov 2023 0m away

    Discharge of Condition 23 against planning permission CB/12/03613/OUT (Outline planning permission with the details of access, appearance, landscaping, layout and scale reserved for later determination. Development to comprise: up to 5,150 dwellings (Use Class C3); up to 202,500 sqm gross of additional development in Use Classes: A1, A2, A3 (retail), A4 (public house), A5 (take away); B1, B2, B8 (offices, industrial and storage and distribution); C1 (hotel), C2 (care home), D1 and D2 (community and leisure); car showroom; data centre; petrol filling station; car parking; primary substation; energy centre; and for the laying out of the buildings; routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; engineering operations. All development, works and operations to be in accordance with the Development Parameters Schedule and Plans.)

    Decided Conditions Demolition 46 docs
    Major scheme
  • Phase 4, Parcel 1, Houghton Regis North 1, Sundon Road, Houghton Regis, LU5 5GX

    CB/25/03288/DOC Submitted 15 Oct 2025 0m away

    Discharge of Conditions 8, 24, 26, 29, 32, 33 & 35 against planning permission CB/12/03613/OUT (Outline planning permission with the details of access, appearance, landscaping, layout and scale reserved for later determination. Development to comprise: up to 5,150 dwellings (Use Class C3); up to 202,500 sqm gross of additional development in Use Classes: A1, A2, A3 (retail), A4 (public house), A5 (take away); B1, B2, B8 (offices, industrial and storage and distribution); C1 (hotel), C2 (care home), D1 and D2 (community and leisure); car showroom; data centre; petrol filling station; car parking; primary substation; energy centre; and for the laying out of the buildings; routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; engineering operations. All development, works and operations to be in accordance with the Development Parameters Schedule and Plans.)

    Decided Conditions Demolition 32 docs
    Major scheme
  • Phase 4, Parcel 6, Houghton Regis North 1, Sundon Road, Houghton Regis, LU5 5GX

    CB/25/03289/DOC Submitted 15 Oct 2025 0m away

    Discharge of Conditions 8, 24, 26, 29, 32, 33 & 35 against planning permission (CB/12/03613/OUT) (Outline planning permission with the details of access, appearance, landscaping, layout and scale reserved for later determination. Development to comprise: up to 5,150 dwellings (Use Class C3); up to 202,500 sqm gross of additional development in Use Classes: A1, A2, A3 (retail), A4 (public house), A5 (take away); B1, B2, B8 (offices, industrial and storage and distribution); C1 (hotel), C2 (care home), D1 and D2 (community and leisure); car showroom; data centre; petrol filling station; car parking; primary substation; energy centre; and for the laying out of the buildings; routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; engineering operations. All development, works and operations to be in accordance with the Development Parameters Schedule and Plans). Please see supporting Covering Letter for details

    Decided Conditions Demolition 42 docs
    Major scheme
  • Local Centre Parcel, Linmere (HRN1), Phase 1, Waterslade Way & Lime Tree Drive, Houghton Regis, LU5 7AS

    CB/26/00907/DOC Submitted 20 Mar 2026 490m away

    Discharge of Condition 11 against planning permission ref. CB/23/03987/RM (Reserved Matters: following Outline Application CB/12/03613/OUT (Outline planning permission with the details of access, appearance, landscaping, layout and scale reserved for later determination. Development to comprise: up to 5,150 dwellings (Use Class C3); up to 202,500 sqm gross of additional development in Use Classes: A1, A2, A3 (retail), A4 (public house), A5 (take away); B1, B2, B8 (offices, industrial and storage and distribution); C1 (hotel), C2 (care home), D1 and D2 (community and leisure); car showroom; data centre; petrol filling station; car parking; primary substation; energy centre; and for the laying out of the buildings; routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; engineering operations. All development, works and operations to be in accordance with the Development Parameters Schedule and Plans.) Reserved matters approval sought for layout, scale, appearance, landscaping and access relating to Local Centre Parcel, Phase 1.)

    Decided Conditions Demolition 9 docs
    Major scheme
  • Local Centre Parcel, Linmere (HRN1), Phase 1, Waterslade Way & Lime Tree Drive, Houghton Regis, LU5 7AS

    CB/26/00852/DOC Submitted 16 Mar 2026 490m away

    Discharge of Condition 14, against planning permission ref. CB/23/03987/RM (Reserved Matters: following Outline Application CB/12/03613/OUT (Outline planning permission with the details of access, appearance, landscaping, layout and scale reserved for later determination. Development to comprise: up to 5,150 dwellings (Use Class C3); up to 202,500 sqm gross of additional development in Use Classes: A1, A2, A3 (retail), A4 (public house), A5 (take away); B1, B2, B8 (offices, industrial and storage and distribution); C1 (hotel), C2 (care home), D1 and D2 (community and leisure); car showroom; data centre; petrol filling station; car parking; primary substation; energy centre; and for the laying out of the buildings; routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; engineering operations. All development, works and operations to be in accordance with the Development Parameters Schedule and Plans.) Reserved matters approval sought for layout, scale, appearance, landscaping and access relating to Local Centre Parcel, Phase 1.)

    Decided Conditions Demolition 11 docs
    Major scheme

In Central Bedfordshire

  • CB/26/02652/NMA Granted

    Chamberlains Barn Quarry Phase 2, Heath Road, Leighton Buzzard, LU7 3AD

    Non-material amendment to planning permission CB/25/03908/VOC. Amendment sought Change the Oxford Lifestyle 3 bed housetype to the Oxford 3 bed + Study housetype.

    25 Aug 2026 Amendments
  • CB/26/02651/NMA Granted

    Spinney Pool Industrial Estate, Billington Road, Leighton Buzzard, LU7 9HH

    Non-material amendment to planning permission CB/25/03665/FULL. Amendment sought to vary the wording of condition 20 with reference to the Public Art timetable and requirements for implementation

    25 Aug 2026 Amendments
  • CB/26/02693/NMA Awaiting decision

    Clipstone Park Phase 1, land off Hockliffe Road, Leighton Buzzard, LU7 9Ny

    Non-material amendment to planning permission CB/18/01758/RM. Amendment Sought Change of external material to plots 3 and 4, from facing brickwork to render.

    27 Aug 2026 Amendments
  • CB/26/02643/NMA Granted

    22 Lucas Way, Shefford, SG17 5DT

    Non-Material Amendment to planning permission CB/26/00145/FULL. Amendment sought for revised glazing to rear extension

    24 Aug 2026 Amendments
  • CB/26/01254/VOC Granted

    Land South of Northwood End Road, and East of Meadow Piece, Haynes, Bedford, MK45 3QB

    Variation of condition numbers 2 and 12 of planning permission CB/23/02270/VOC (Variation of condition 2 of planning permission CB/22/02399/REG3 (Erection of 27 dwellings including self build, 1 to 4 bedroom units, with associated landscaping, highways, parking and drainage)). Variation sought to approved plans for layout changes to plots 22-24 and house types

    20 Apr 2026 Amendments