Skip to content
PlanIndex Get alerts
Menu

Planning application

CB/26/00846/FULL

Hyde Sewage Treatment Works, Lower Harpenden Road, Hyde, Luton, LU1 3TR

Awaiting decision Central Bedfordshire Full Application

Proposal

Retrospective permission for the erection of Unit 3 (welfare facility), Unit 4 (drying room) and Unit 5 (storage unit).

As published by the council, reference CB/26/00846/FULL

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Central Bedfordshire

  2. 15 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Central Bedfordshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • CB/26/00850/LDCE Awaiting decision

    Hyde Sewage Treatment Works, Lower Harpenden Road, Hyde, Luton, LU1 3TR

    Lawful Development Certificate Existing: Continued use of two metal storage units (Unit 1 and 2) and one temporary tanked portaloo. 2.4m palisade fencing with a manual gate accessed from Lower Harpenden Road

    16 Mar 2026 0m away Lawful development
  • 26/00504/FUL Awaiting decision

    Flat 1 12 Cardiff Grove Luton LU1 1QH

    Erection of a single storey rear extension to facilitate the conversion of the existing two bedroom flat into a three bedroom flat.

    12 May 2026 103m away Full applications
  • 26/00392/DOC Awaiting decision

    The Albany 4 Cardiff Road Luton LU1 1PP

    Request for a determination as to whether prior approval is required under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) Order 2015 - Change of use of business floor space and health service facilities (Class E) to 19 flats (1 two bed and 18 one bed) (Class C3). Discharge of conditions 3 (Acoustic Report), 4 (External sound level) and 8 (Management Plan) of Planning permission 24/01144/PAEDWE dated 9 December 2024.

    16 Apr 2026 106m away Conditions
  • 23/00146/FUL Granted

    Apex House 30 - 34 Upper George Street Luton LU1 2RD

    Replacement of external windows and doors including modifying 1 window to door.

    8 Feb 2023 214m away Full applications
  • 24/00893/TPOS Granted

    Lennon Court Downs Road Luton LU1 1QQ

    Works to Trees - Located within G2 and TPO - APC G002 - Mixed species - Crown lift to 3m above footpath on either side. prune back from street light/road sign/fence line for maximum 1m clearance. - APC T001 - Elder - prune back from adjacent building for max 1m. - APC T002 - yew - prune back from adjacent building for max 1m. - APC T004 - Acer - prune back from adjacent building for max 1m. - APC T008 - unknown dead tree. Located within G1 of TPO. Fell to ground level dead self set tree. No proposed replacement. APC T012 - Cherry. Located within G1 of TPO, for clarity, but possibly not covered by TPO. Fell to ground level self set tree, inappropriate location. No proposed replanting.

    26 Jul 2024 223m away Trees
  • 23/00040/PACOM Granted

    70 - 78 Collingdon Street Luton LU1 1RX

    Request for a determination as to whether prior approval is required under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) Order 2015 - Change of use of first and second floor of building from office space (Class E) to (C3) residential. (Class MA). The scheme comprises 2 one bedroom and 2 two bedroom new dwellings.

    5 Jan 2023 252m away

In Central Bedfordshire

  • CB/26/01912/FULL Awaiting decision

    23 Longden Close, Haynes, Bedford, MK45 3PJ

    Single-storey rear extension with roof light and bi-fold doors

    6 Aug 2026 Full applications
  • CB/26/01091/FULL Withdrawn

    Holme Court, London Road, Biggleswade, SG18 9ST

    Erection of new warehouse and distribution centre with associated access road and service area

    7 Apr 2026 Full applications
  • 5 Bernard Close, Dunstable, LU5 4HL

    First floor rear extension above existing, insertion of first floor window on side elevation and demolition of existing garage.

    19 Mar 2026 Full applications
  • 3 Church Hill, Aspley Guise, Milton Keynes, MK17 8HW

    Erection of a first-floor side extension

    20 Apr 2026 Full applications
  • Stanbury Farm, Tilsworth Road, Stanbridge, Leighton Buzzard, LU7 9HY

    Reinstatement of vehicle access and removal of a section of hedge (retrospective)

    14 May 2026 Full applications