Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Chapel Road, Flitwick, Bedford, MK45 1EB

Granted Central Bedfordshire CB/25/01582/FULL Full Application

Works: Extension Loft or dormer Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey rear extension with roof lights, extension to existing dormer, loft conversion, alterations to windows, demolition of garage and creation of parking space.

As published by the council, reference CB/25/01582/FULL

Application record

Reference
CB/25/01582/FULL
Type
Full Application
Status
Decided
Decision
Granted As published: Full Application - Granted
Received
12 May 2025
Validated
8 Oct 2025
Decided
30 Apr 2026
Parish
Flitwick
Decision by
Officer Delegated
Postcode
MK45 1EB

Site history

Applications at this address on the Central Bedfordshire register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • CB/24/01337/FULL Withdrawn

    17 Chapel Road, Flitwick, Bedford, MK45 1EB

    Two storey part single storey rear extension, and first floor rear extension, removal of garage.

    Decided 3 Sep 2024 Full applications

Timeline

Dates from the published record

  1. 12 May 2025

    Received by Central Bedfordshire

  2. 8 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 30 Apr 2026

    Decision issued: Full Application - Granted

  4. 9 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Central Bedfordshire granted permission on 30 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 51 Chapel Road, Flitwick, Bedford, MK45 1EB

    CB/24/02138/FULL Submitted 19 Jul 2024 50 yards away

    New Orangery to the rear of the property

    Granted Full applications Extension 7 docs
  • 32 Chapel Road, Flitwick, Bedford, MK45 1EB

    CB/22/04598/FULL Submitted 28 Nov 2022 50 yards away

    Retrospective Change of use to annexe for use as an AirBnB (short term holiday let)

    Granted Full applications 24 docs
  • 17 Chapel Road, Flitwick, Bedford, MK45 1EB

    CB/24/01337/FULL Submitted 7 May 2024 50 yards away

    Two storey part single storey rear extension, and first floor rear extension, removal of garage.

    Withdrawn Full applications Extension 15 docs
    Small domestic
  • 49 Chapel Road, Flitwick, Bedford, MK45 1EB

    CB/21/02614/FULL Submitted 3 Jun 2021 50 yards away

    Extension of an original outbuilding

    Granted Full applications Extension 5 docs
  • 32 Chapel Road, Flitwick, Bedford, MK45 1EB

    CB/19/03577/NMA Submitted 24 Oct 2019 50 yards away

    Non-material amendment to planning permission CB/19/00093/FULL (Demolition of the existing single storey side extension and the two storey rear extensions and replace with two storey side and rear extension including alterations and changes to fenestration): Proposed amendment to roof plan.

    Refused Amendments Extension Demolition +1 5 docs
    Small domestic
  • 32 Chapel Road, Flitwick, Bedford, MK45 1EB

    CB/26/00241/VOC Submitted 26 Jan 2026 50 yards away

    Removal of condition number 1 of planning permission CB/22/04598/FULL (Retrospective Change of use to annexe for use as an AirBnB (short term holiday let) Variation sought: Condition 1 request for provision of a fire hydrant to be removed after receiving details to that affect from the Fire Service

    Granted Amendments 6 docs

In Central Bedfordshire

  • 107 Thillans, Cranfield, Bedford, MK43 0WP

    Single storey rear and side extensions with rooflights

    Received 4 Aug, published by the council 27 Aug 2026 Full applications
  • 39 Church Road, Totternhoe, Dunstable, LU6 1RE

    Removal of conservatory, replaced with single storey rear extension and rooflight, garage conversion, replace existing hanging wall tiles and fenestration changes

    Received 7 Aug, published by the council 27 Aug 2026 Full applications
  • 4 Bedford Road, Barton-le-Clay, Bedford, MK45 4JU

    Single storey rear extension

    Received 20 Jul, published by the council 18 Aug 2026 Full applications
  • 16 Parmiter Way, Ampthill, Bedford, MK45 2RQ

    Single storey side/rear extension with rooflight and partial garage conversion. Alterations to fenestration.

    Received 28 Jul, published by the council 28 Aug 2026 Full applications
  • 33 Staveley Road, Dunstable, LU6 3QQ

    Garage conversion, with insertion of a front window and increased roof height

    Received 22 Jun, published by the council 27 Aug 2026 Full applications