Planning application
Network Rail Compound, Steamer Croft, Cambridge Road, Langford, SG18 9PL
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Electricity Works- Permitted Development : Installation of Electricity Substation
As published by the council, reference CB/24/03491/EPD
Application record
- Reference
- CB/24/03491/EPD
- Type
- Electricity works -Permitted Development
- Status
- Decided
- Decision
- Pre-application Advice Released
- Received
- 3 Dec 2024
- Validated
- 3 Dec 2024
- Decided
- 4 Dec 2024
- Postcode
- SG18 9PL
Timeline
Dates from the published record
-
3 Dec 2024
Received by Central Bedfordshire
-
4 Dec 2024
Decision issued: Pre-application Advice Released
-
18 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Central Bedfordshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
JCN Station Road PCO1 Cambridge Road Langford Biggleswade SG18 9PL
Payphone Kiosk Removal Consultation
Decided 1 doc -
91 Station Road, Langford, Biggleswade, SG18 9PQ
Single storey rear extension with roof lights
Granted Full applications Extension Loft or dormer 10 docsSmall domestic -
Hill Farm, Edworth Road, Langford, Biggleswade, SG18 9PJ
Prior approval of change of use from agricultural building to flexible commercial use. The proposed works will be as detailed in Class B8 Storage & Distribution.
Refused Other 10 docs -
27 Cambridge Road, Langford, Biggleswade, SG18 9PS
Conversion of existing barn to residential annexe with a single storey link extension to the host dwelling.
Granted Full applications Extension 15 docsSmall domestic -
29 Cambridge Road, Langford, Biggleswade, SG18 9PS
Part garage conversion, front extension and new porch
Granted Full applications Extension 4 docsSmall domestic -
70 Cambridge Road, Langford, Biggleswade, SG18 9PS
Proposed demolition of outbuildings & single storey rear extension and erection of two storey side extension & single storey rear extension
Granted Full applications Extension Demolition 12 docsSmall domestic
Other prior approval applications
In Central Bedfordshire
-
CB/26/02527/EPD Decided
Land at Oakwell Park, LU5 6GU
Electricity Works Permitted Development: To relocate an existing substation
-
CB/26/02449/EPD Decided
Biggleswade Eastern ELC Sub Station, Holme Crescent, Biggleswade, Bedfordshire. SG18 8DF
Electricity Works Permitted Development (Install a new 10kVA generator on new concrete foundation. Install power duct from source to genny. Install wide cable trunking on concrete base. Install AMF panel on a new pole fixed to concrete base. Retain the Eltek PSU cabinet)
-
CB/26/02429/EPD Withdrawn
Four Fields, Tebworth Road, Tebworth, Leighton Buzzard, LU7 9PZ
Electricity Works Permitted Development related to an overhead line.
-
CB/26/02317/EPD Awaiting decision
Four Fields, Tebworth Road, Tebworth, Leighton Buzzard, LU7 9PZ
Electricity Works Permitted Development, disconnection of existing O/H to U/G single phase service and connection of a new three phase O/H service with a new pole installation.
-
CB/26/01178/EPD Granted
7 Water End, Wrestlingworth, Sandy, SG19 2HA
Electricity Board Notification: To rectify an existing safety compliance issue with the current low voltage overhead service to the property No 7 Water End, SG19 2HA. The proposal is to install a new intermediate pole and install new underground cable. The existing low voltage overhead service will then be removed.