Skip to content
PlanIndex Get alerts
Menu

Planning application

Basement and Ground Floor of 16 High Street North, Dunstable, LU6 1JZ

Granted Central Bedfordshire CB/24/01934/FULL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of the basement and ground floor of a vacant Class E unit, previously occupied by a bank, to an Adult Gaming Centre (sui generis use)

As published by the council, reference CB/24/01934/FULL

Application record

Reference
CB/24/01934/FULL
Type
Full Application
Status
Decided
Decision
Full Application - Granted
Received
2 Jul 2024
Validated
13 Aug 2024
Decided
27 Nov 2024
Parish
Dunstable
Decision by
Officer Delegated
Postcode
LU6 1JZ

Timeline

Dates from the published record

  1. 2 Jul 2024

    Received by Central Bedfordshire

  2. 13 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 27 Nov 2024

    Decision issued: Full Application - Granted

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 High Street North, Dunstable, LU6 1JZ

    CB/24/01941/ADV Submitted 2 Jul 2024 0m away

    Advertisement: One internally illuminated fascia sign and one internally illuminated projecting sign

    Granted Advertising 15 docs
  • 16 High Street North, Dunstable, LU6 1JZ

    CB/24/01940/FULL Submitted 2 Jul 2024 0m away

    Alterations to shopfront to remove ATM machines and reconfiguration involving new entrance door. Alterations to remove rear window and replace with rear entrance door with roller shutter

    Granted Full applications Windows or glazing 16 docs
  • First and Second Floor of 11 High Street North, Dunstable, LU6 1HY

    CB/26/00841/FULL Submitted 13 Mar 2026 53m away

    85% historically approved · decision due ~5 Jun

    Conversion of upper floor levels (first and second) to 4 residential studio flats with access via existing separate High Street entrance

    Awaiting decision Full applications New dwelling 34 docs
  • 36-36A High Street North, Dunstable, LU6 1LA

    CB/23/01110/FULL Submitted 31 Mar 2023 63m away

    Conversion of 1st and 2nd floors from office / plant rooms to 4no residential flats (C3) with reinstatement of timber sash windows.

    Granted Full applications New dwelling Windows or glazing 23 docs
  • 36-36A High Street North, Dunstable, LU6 1LA

    CB/23/01111/LB Submitted 31 Mar 2023 63m away

    Listed Building: Conversion of 1st and 2nd floors from office / plant rooms to 4no residential flats (C3) with reinstatement of timber sash windows.

    Granted Heritage and listed buildings New dwelling Windows or glazing 16 docs
  • 4 High Street North, Dunstable, LU6 1LA

    CB/23/00318/FULL Submitted 31 Jan 2023 63m away

    Alterations to the external building, all fascia and projecting signage to be removed. ATM and night safe to be removed and infilled. All marketing to be removed.

    Granted Full applications 26 docs

In Central Bedfordshire

  • CB/26/01825/FULL Awaiting decision

    36 Manor Close, Langford, Biggleswade, SG18 9PU

    Garage conversion, increase roof height and single storey rear extension to facilitate a granny annex. External alterations including new window and door openings, and external render.

    Full applications
  • 17 Coltsfoot, Biggleswade, SG18 8SR

    Erection of a single storey side extension

    4 Jun 2026 Full applications
  • 24 Home Farm Way, Westoning, Bedford, MK45 5LL

    Erection of a single level garden log cabin at the end of the garden

    26 May 2026 Full applications
  • Bracken Ley, London Lane, Houghton Conquest, Bedford, MK45 3LP

    Redevelopment of the site entailing the demolition of existing barns and the erection of five dwellings with cycle/garden stores, replacement garage for the existing dwelling and associated works.

    8 May 2026 Full applications
  • CB/26/01291/FULL Withdrawn

    56 Manor Road, Barton-le-Clay, Bedford, MK45 4NP

    Two storey side and front extensions, removal of rear porch, raising and re-profiling of roof and replacement fenestrations throughout

    22 Apr 2026 Full applications